My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2004 Mark Thomas & Company Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2004
>
Agmt 2004 Mark Thomas & Company Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2009 1:03:40 PM
Creation date
8/12/2009 1:03:39 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
7/19/2004
Retention
PERM
Document Relationships
Reso 2004-119
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
It is assumed that the fuel line is to be relocated. The utility owner shall perform the <br />relocation design and construction. <br />Levee Analysis and Certification <br />Consultant will perform levee stability analysis and other required tasks to prepare document <br />and form to have the levee certified by the FEMA as required by the governing agency. <br />City Provided Information and Services <br />City shall provide the Consultant services and information outlined below so that Consultant <br />can produce the design of this Bay Trail Project. Consultant shall review materials provided <br />and bring any discrepancies to City's attention but othervvise reserves the right to rely on <br />accuracy and completeness of all information provided by City. <br />1. Electronic file on disk with: <br />a. City standard border and title block <br />b. Standard Drawings title sheet <br />c. Standard legend and abbreviations sheet <br />d. Standard City details for the improvements <br />2. Survey information on a file disk in Electronic format including: <br />a. Digital ortho photographs (electronic file) <br />b. Horizontal control ties to monuments <br />c. Vertical ties to a City benchmark <br />d. Horizontal and vertical control <br />3. Available trail improvement plans, and record drawings of facilities relating to this <br />project including copies of Planning Study, EIR, and related documents. <br />4. Copies of general conditions, standard drawings pertaining to this project and standard <br />bidding documents used by the City to bid construction projects and a sample of typical <br />project plans and specifications. Standard details shall be in electronic file format. <br />5. Electronic version of sample special provisions'for contract documents. An electronic <br />copy of the standard provisions. <br />6. Rights-of--entry for all private properties within the area of work, if necessary. <br />7. All environmental clearances such as required by CEQA document. <br />Bay Trail Slough Bridge July 19, 2004 <br />Project No. 144-39-012 Page 21 of 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.