My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 Bellecci & Associates Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 Bellecci & Associates Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2009 2:42:49 PM
Creation date
8/13/2009 2:42:48 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
1/21/2003
Retention
PERM
Document Relationships
Reso 2003-011
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.3 Cost Estimate -The Contractor shall prepare a 100% cost estimate with an <br />estimated cost of construction broken down into standard bid items for all <br />elements shown on the 100% Plans. <br />2.4 Review Meeting -The Contractor shall provide 3 sets of the 100% Plans to the <br />City for review by and distribution to City departments. The City departments <br />shall review the 100% Plans and prepare comments for Contractors to incorporate <br />into the Final Plans. <br />Task 3 -Final Design <br />31 Final Plans -The Contractor shall prepare Final Plans. All sheets shall be <br />prepared in accordance with the City's drafting standards and will be on City's <br />standard borders supplemented by Contractor's drafting standards and standard <br />details, symbols, and abbreviations as appropriate. The CAD files will be saved <br />in AutoCAD 2002 format. The City will receive an AutoCAD copy of the <br />drawing files and 3 sets of the Final Plans. <br />3.2 Final Specifications - The Contractor shall prepare Final Technical <br />Specifications. The Specifications will be prepared in City's standard format <br />using MS Word, and in accordance with the Standard Specifications for Public <br />Works Construction, (The Green Book). <br />3.3 Final Cost Estimate -The Contractor shall prepare a final cost estimate with an <br />estimated cost of construction broken down into standard bid items for all <br />elements shown on the Final Plans. <br />Additional Services: <br />Other items of work not described above may be added to the scope of work with an <br />approved work authorization and budget from the City. Examples of additional services <br />include: <br />• Drainage calculations/study <br />• Landscaping design and plans <br />• Design of signal modification/relocation <br />• Structural engineering <br />• Legal plats and descriptions <br />• Additional submittals <br />Contractual Services Agreement Phase 2 -Final Design Services Page 5 of 17 <br />Revised 5-02 Hesperian Blvd. and Lewelling Blvd. Widening Project, Project No. 03-144-39-002, ACTIA Project No. 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.