My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 Harris Design
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 Harris Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2009 4:57:15 PM
Creation date
8/13/2009 4:57:15 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
3/17/2003
Retention
PERM
Document Relationships
Reso 2003-075
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ c <br />EXHIBIT A <br />SCOPE OF SERVICES <br />Introduction: <br />This contract is for the design services of improvements to Floresta Park. Improvements include <br />replacing two existing playground areas with new playground equipment that meets Consumer <br />Products Safety Commission (CPSC) and Americans with Disabilities Act (ADA) requirements. <br />The scope of the improvements is limited to the items listed below. Design of additional <br />construction scope items is not included in this scope of services, but could be provided as <br />additional services with additional compensation. The estimated construction value of these <br />irnprovernents is approximately $260,000 based on the concept plan dated September 9, 2002. <br />• Demolition of existing improvements <br />• School-age play area <br />• Pre-school play area <br />• Swings areas <br />• Picnic areas (two) with picnic tables <br />• Benches <br />• Pathways <br />• Planting <br />• Irrigation <br />• Landscape maintenance period (plant establishment) <br />• Trash receptacles <br />Design of additional construction scope items is not included in this scope of services, but could be <br />provided as additional services with additional compensation. The estimated construction value of <br />these improvements is approximately $260,000. <br />2.0 Design Development (30% PSE): <br />2.01 Project Initiation Meeting <br />Meet with City Staff to review scope of the master-planned improvements and discuss <br />any desired modifications or additions. Walk site to review the existing conditions and <br />proposed locations for new and modified park elements. <br />2.02 Site Reconnaissance <br />The consultant team will conduct a detailed site walk to verify all visually apparent <br />features and ground-truth the topographic survey (to be provided by the City at no cost to <br />Harris Design). <br />2.03 Coordination with Play Equipment Manufacturers <br />Meet with City Staff and play equipment manufacturer's representative to finalize <br />selection of play equipment. Coordinate with representative throughout the project. <br />Contractual Services Agreement- <br />Floresta Park Playground Renovation <br />Page 3 of 18 <br />Project No. 210-69-201 <br />
The URL can be used to link to this page
Your browser does not support the video tag.