Laserfiche WebLink
14. Outline Specifications. Outline specifications describing the type and quality of building systems, <br />basic components, and components unique to the project. Outline specifications forthe engineering disciplines fisted <br />in (13} "Engineering Plans and Specifications" above shall be included. <br />15. Preliminary Construction Cast Estimate. A preliminary construction cast estimate consisting of a <br />projected cost for the construction project based on the most recent schematic design studies, current and historic <br />area, volume, or other unit casts. The estimate shall include an assemblies (or CSi format} estimate sufimary. <br />DESIGN QEVELOPMEtJT PLANS AND SPECIFICATIaNS REVIEW. The grant rEGlplent Shall prOVlde the follQWing: <br />? . Site.Plan. A site plan showing all buildings dimensioned from adjacent structures or other criticaE site <br />features, datum elevations at all entries, street lines and grades, property lines, required setbacks, easements, <br />parking, sidewalks, preliminary site and exterior building lighting scheme with identification of fixture .,types, :and <br />routing of sewer, water, gas and other utilities, site detailing showing typical external elements. <br />2. Plaar Plans. Floor plans showing complete functional layout, roam designations, all major <br />dimensions, ail critical dimensions, and all columns. <br />3, Exterior Elevations, Elevations showing fulhheight facades, type and extent of exterior finishes, all <br />openings including fenestration, and overall vertical building heights related to established building datum. Indicate <br />treatment of visible mechanical equipment and abutting topograahy and grade relatonship. <br />4. Roof Plan. A roof plan delineating roofing materials, direction and slope of roof; relatonship of <br />exterior wall to roof, overhangs and covered areas; mechanical equipment areas and screening; and location and <br />major dimensions for major roof elements. <br />5. Building Sections. Two building sections (one longitudinal and one latitudinal} showing the overall <br />building solution with typical wall construction, foundation, parapet design, insulation methods, window, mechanical <br />penetratons impact, relationship of various levels, floor to ceiling heights, and ceiling height and bookstack height <br />coordination anticipatng code compliant fire sprinkler installation. <br />6. Details. Detail sheets showing key condltans, such as, window and frame types, frame and. door <br />types, typical wall types, non-typical design-related detailing. <br />7. Interior Elevations. lnterior elevations showing typical and special spaces, and any built-in cabinetry. <br />or counter items. These drawings shalt be of pre-final quality adequate to convey design intent. Basic dimensions <br />shall be delineated, along with casework, counters, and other built-ins with heights and depths shown. <br />8. Reflected Ceiling Plan. Reflected ceiling plan integrated to show structural, mechanical, and <br />electrical impacts, including low voltage systems, e.g. security, audio-visual, and public address system speakers. <br />8. Schedules. Schedules are to be non-repetitive and comprehensive with keying to floor plans and <br />elevations; pre-final interior finishes, frame and door, window and glazing, and preliminary hardware. <br />10. Furniture, Furnishings, and Equipment Plan. Furniture, furnishings, and equipment plan with any <br />special interior design features. Preliminary documentation of materials, finishes, and colors. <br />11. Signage Schedule and Plan. Signage schedule and plan indicating the size, type and nomenclature <br />of all interior signs, <br />?2. Assignable Square Footage Comparison. A tabulation of the assignable square footage for each <br />area called for in the final library building program compared to the assignable square footage shown on the floor <br />plan. Any changes from the accepted schematic plans shall be highlighted. <br />13. Engineering Plans and Specifications. <br />A, Civil: Grading, drainage, and preliminary details for on-site and off-site work. <br />B. Structural: Basic structural system and dimensions, structural and foundation design criteria, <br />and preliminan~ sizing of major structural components. <br />Final (~~aified) riti~ ~~ ~ibr~~r~~ ~~~d ~~~ ~egulaii®ra~ <br />E~fec#ive ~ate..lanuar~ ~, ?00~ <br />