My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 Group 4 Architecture
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 Group 4 Architecture
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2009 9:39:38 AM
Creation date
8/14/2009 9:39:36 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
3/17/2003
Retention
PERM
Document Relationships
Reso 2003-078
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />SCOPE OF SERVICES <br />1.0 DESCRIPTION: <br />This contract is for design of a new 9,500 square foot library building to be located at <br />1241 Manor Boulevard in the City of San Leandro. The new building shall generally <br />conform to the Manor Branch Public Library 100% Schematic design dated May 6, 2002, <br />prepared by Group 4 Architecture except that the mechanical system shall not include a <br />radiant slab but shall instead be conventional forced air. Work shall be as required to <br />produce a set of plans and specifications and secure all required permits as detailed <br />herein. Construction cost estimates shall be provided with all submittals to the City. <br />Construction work shall be phased so that the existing library may remain in service until <br />the new library is operational. <br />The plans and specifications shall set forth the details of the construction including <br />sitework, landscaping, structural systems, architectural systems, electrical systems (lights, <br />power, phone, data), mechanical systems, security systems, and plumbing systems. The <br />work shall include built in cabinetry at the program room, kitchen area, restrooms, <br />lounge, delivery, book return and transaction desk, lobby (computer tables), and <br />information desk. A prof ector and retractable screen shall be specified at the program <br />room along with an AV system capable of running computer displays, vhs and dvd <br />entertainment and including a microphone system for voice. A platform or false floor to <br />allow for maximum flexibility of utilities in the library area shall be explored. It is <br />anticipated that one or more doors will use electronic locks. <br />2.0 BASIC SERVICES <br />2.1 STATE SCHEMATIC DESIGN SUBMITTAL <br />The Consultant shall prepare and submit Schematic Design submittal to the State. <br />2.1.1 The Consultant shall prepare written responses and drawing revisions as required to the <br />Office of Library Construction Conceptual Design review comments. <br />2.1.2 The Consultant shall prepare a Schematic Design submittal for the Office of Library <br />Construction consistent with their submittal requirements. <br />2.1.2.1 The Consultant shall prepare specific exhibits for the Office of Library Construction <br />submittal such as tabulation tables for assignable squire footage, collections, <br />technology, and seating. <br />Meetings: One meeting with the PMT. <br />Deliverables: Schematic Design Drawing Package; updated Statement of Probable <br />Construction Cost, and Outline Specifications. <br />2.2 DESIGN DEVELOPMENT PHASE <br />2.2.1 The Consultant shall prepare project objectives and schedule; and meet with <br />Project Management Team. <br />Washington Manor Branch Library Page 3 of 22 <br />Group 4 Architecture CSA <br />
The URL can be used to link to this page
Your browser does not support the video tag.