My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2003-094
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2003
>
Reso 2003-094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2009 4:08:43 PM
Creation date
8/14/2009 11:10:13 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
4/7/2003
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN LEANDRO ADMINISTRATIVE CODE <br />TITLE 6 FINANCE <br />Chapter 4 Fees <br />2003-04 <br />Adopted <br />§6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative <br />Code (SLAG) or the general laws of the State of California. <br />Descri lion Ctiurent Fee Reference <br />COMM[1NITY DEVELOPMENT DEPARTMENT -Building Regulations Division <br />e. Plan Checking (continued) <br />(3) By Outside Consultant, When Requested Equal to In-house -During Regular Workin Hours PLUS <br />By Applicant Consuktant's fee as established by Agreement {contract) <br />between City and Consultant <br />(4) Over the Counter for Small Changes, Duect Cost (1), with minimum ofone-half hour <br />Revisions or Additions, When Requested by <br />A_ppliCant <br />(5) Energy Conservation: for all buildings 20% of Building Permits <br />subject to the California Energy <br />Conunission's conservation regulations <br />_.. _ _ _. <br />3. Electrical Pern~it <br />a. Issuance Fee $23.00 plus the amount shown for each electrical item <br />' involved in the work, as shown below <br />- _ <br />b. Minimum fee $50.00 plus each item installed, as shown below <br />c. Plan-Check, when applicable Direct Cost (1) <br />Circuits: Installation, replacement or alteration of each electricak circuit (includes related outlets, switches, receptacle <br />and fighting fixtures): <br />1 to 20 ampere circuit $8.00 <br />21 to 30 ampere circuit $8.75 <br />31 to 40 ampere circuit $9.00 <br />41 to 50 ampere circuit $9.75 <br />_.. <br />(1) Direct Cost =hourly personnel charge plus a factor of 100% for fringe benefits, overhead and indirect costs <br />04I07I03 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.