Laserfiche WebLink
• Cover sheet <br />• Demolition plan <br />• Site layout plan <br />• Play area enlargement layout plan <br />• Grading and drainage plan <br />+ Electrical plan <br />• Electrical details <br />• Irrigation plan <br />• Irrigation details <br />• Planting plan <br />• Planting details <br />• Construction details <br />• Technical specification sections (City shall be responsible for general conditions and <br />boilerplate) <br />• Estimate of probable construction cost <br />3.03 Review with City Staff <br />Meet with City Staff to review the 70% submittal. <br />3.04 Final Bid Documents <br />Revise the 70% submittal documents as necessary. Provide one set of final plans, <br />specifications, and estimates to the City for advertisement to bid. <br />3.05 Bidding Assistance <br />Provide up to 6 hours of principal time to respond to bidders questions (all <br />communication to be through the City project manager), provide clarifications, and any <br />other requested assistance. <br />Additional Services: <br />In addition to performing the above Basic Services, Harris Design shall perform, upon the <br />Client's request, any desired Additional Services such as the following: <br />• Attending additional meetings not described in the scope of services. <br />• Providing services to make measured drawings, or to verify the accuracy of drawings or other <br />information, including survey information furnished by the Client. <br />• Providing services to investigate the work of separate consultants retained by the Client. <br />• Revising drawings or other documents when the revisions are inconsistent with written <br />approvals or instructions previously given; required by the enactment or revision of codes, <br />laws or regulations subsequent to the preparation of such documents; and/or due to other <br />causes not solely within Hams Design's control. <br />• Preparing perspectives, renderings, or models upon the Client's request and not otherwise <br />provided herein. <br />G~herry Grove Park P]ay~round Renovation Page a of 24 <br />Contractual Services Agreement Project No, I50-69-195 <br />