Laserfiche WebLink
EXHIBIT A <br />SCOPE OF SERVICES <br />1.0 DESCRIPTION: <br />This contract is for design of replacement and new piping at the Water Pollution Control <br />Plant in the City of San Leandro. The first run of piping is 6" primary pipe that runs from <br />the primary settling tanks approximately 280 lineal feet westward to a point west of the <br />secondary digester number two. This section includes approximately 40 lineal feet of <br />new pipe. A bypass and valve shall be added at the flow meter in the pump room of the <br />primary digester number four. The second run of piping is 6" feed pipe that runs from <br />the Northeast corner of the control building approximately 250 lineal feet around the <br />sludge thickener to the primary digester number four. The third section of piping runs <br />from the pit between the primary clarifiers approximately 180 lineal feet around the plant <br />maintenance building and connects to the first run of piping described above. This <br />section includes approximately 10 lineal feet of new piping adjacent to the pit. The <br />fourth run of piping is 6" feed pipe that runs from near the sludge control building <br />northward to the Northeast corner of the plant control building approximately 240 lineal <br />feet. Design shall include fittings, clean outs, valves, connection points, and in-ground <br />concrete valve boxes as appropriate for efficient operation of the system. <br />Work shall be as required to produce a set of plans and specifications that describe the <br />work to be done in sufficient detail for construction. A construction cost estimate shall. <br />be provided with the 70% and 100% submittal to the City. The first run of piping shall <br />constitute the base bid; the second through fourth runs shall be individual bid alternates. <br />Work includes reviewing existing documentation, evaluating soils corrosivity, and <br />providing as-built drawings. <br />2.0 BASIC SERVICES <br />2.1 70% Construction Documents <br />City tasks: Provide process information and hard copy of drawings of existing <br />piping in the vicinity of the work. Provide City of San Leandro standard details. <br />Contractor tasks: Review information, secure soils analysis, layout work, <br />design piping. <br />Deliverable: 70% Construction Documents: Plans, details, outline specifications, <br />cost estimate, copy of soils analysis (one set of each). Plans maybe submitted as <br />half size provided that all information is legible. <br />2.2 100% Construction Documents <br />City tasks: Review and comment on 70% design. <br />Contractor tasks: Incorporate comments, complete design, coordinate technical <br />specifications with City of San Leandro front-end specifications. <br />Deliverable: 100% Construction Documents: Plans, details, specifications, cost <br />estimate (one set of each). <br />Material Integrity Solutions/CSA Page 3 of I7 <br />Pipe Modernization WPCP Project No. 593-52-202 <br />