Laserfiche WebLink
2.3 Final construction documents <br />City tasks: Review and comment on 100% design. <br />Contractor tasks: Incorporate comments. <br />Deliverable: Final Construction Documents: Plans, details, specifications. One <br />set of plans on bond signed by a licensed design professional. One set of <br />specifications, printed one side, unbound, cover sheet with stamp and signature of <br />responsible designer. Electronic copy plans and specifications. <br />2.4 Construction Assistance <br />Not included in this scope <br />2.5 Post Construction <br />City tasks: Supply contractor's hand-drawn as-built drawings <br />Contractor tasks: Review drawings for conformance with design intent and field <br />conditions. Transfer as-built information to computer aided design drawings. <br />Deliverable: One set of plans and details on bond. Electronic copy of plans and <br />details. <br />3.0 Schedule <br />Submit 70% CD documents <br />Submit 100% CD documents <br />Submit Final CD documents <br />6 weeks from receipt of Notice to Proceed <br />3 weeks from receipt of 70% CD comments <br />1 week from receipt of 100% CD comments <br />4.0 Exclusions <br />The following are excluded from the scope of work: <br />• Process design and pipe sizing <br />• Installation and warranty of equipment <br />• Instrumentation and control requirements <br />• Planning and cost for conducting ground penetrating radar imaging <br />• Operation and maintenance of installation <br />• Evaluating and/or addressing enviromnental and/or hazardous aspects of the <br />project or obtaining any such permits <br />• Testing and perforniance <br />• Any permits or permitting <br />Material Integrity Solutions/CSA Page 4 of 17 <br />Pipe Modemizarion WPCP Project No. 593-52-202 <br />