My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 Material Integrity Solutions
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 Material Integrity Solutions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2009 11:38:46 AM
Creation date
8/14/2009 11:38:45 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
4/7/2003
Retention
PERM
Document Relationships
Reso 2003-098
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.3 Final construction documents <br />City tasks: Review and comment on 100% design. <br />Contractor tasks: Incorporate comments. <br />Deliverable: Final Construction Documents: Plans, details, specifications. One <br />set of plans on bond signed by a licensed design professional. One set of <br />specifications, printed one side, unbound, cover sheet with stamp and signature of <br />responsible designer. Electronic copy plans and specifications. <br />2.4 Construction Assistance <br />Not included in this scope <br />2.5 Post Construction <br />City tasks: Supply contractor's hand-drawn as-built drawings <br />Contractor tasks: Review drawings for conformance with design intent and field <br />conditions. Transfer as-built information to computer aided design drawings. <br />Deliverable: One set of plans and details on bond. Electronic copy of plans and <br />details. <br />3.0 Schedule <br />Submit 70% CD documents <br />Submit 100% CD documents <br />Submit Final CD documents <br />6 weeks from receipt of Notice to Proceed <br />3 weeks from receipt of 70% CD comments <br />1 week from receipt of 100% CD comments <br />4.0 Exclusions <br />The following are excluded from the scope of work: <br />• Process design and pipe sizing <br />• Installation and warranty of equipment <br />• Instrumentation and control requirements <br />• Planning and cost for conducting ground penetrating radar imaging <br />• Operation and maintenance of installation <br />• Evaluating and/or addressing enviromnental and/or hazardous aspects of the <br />project or obtaining any such permits <br />• Testing and perforniance <br />• Any permits or permitting <br />Material Integrity Solutions/CSA Page 4 of 17 <br />Pipe Modemizarion WPCP Project No. 593-52-202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.