Laserfiche WebLink
6. Estimated construction cost of this project is $777,000. <br />7. Design Fees are based upon project scope and budget. Changes in scope or <br />budget may affect the design fees. <br />8. Security System Design is excluded. Coordination of infrastructure (conduit & <br />backboxes) is included. <br />9. Audio Visual Design is excluded. Coordination of infrastructure (conduit & <br />backboxes) is included. <br />10. TeUData Design is excluded; however, coordination of infrastructure (conduit & <br />backboxes) is included. Design of the Tel/Data system is available as an <br />additional service. <br />11. Energy systems such as solar-photovoltaic or solar water heating systems or <br />emergency back-up generator are excluded from design. <br />12. Green Building Design (LEEDS certification) is excluded. <br />13. Acoustic Engineering is not required. <br />14. Fire sprinkler system will be specified as a design /build system with deferred <br />approval. <br />15. Record Drawings will be prepared in electronic format based on information <br />provided by the Contractor at the completion of construction. <br />3.0 SCHEDULE: <br />Project award is anticipated to start in mid-May, 2003. The following is the anticipated <br />schedule for completion of the project. <br />Schematic Design 8 Weeks from Notice to Proceed <br />Design Development 8 Weeks from receipt of comments <br />Schematic Design 6 Weeks from receipt of comments <br />Construction Documents: <br />60% CD Submittal 6 Weeks from receipt of comments <br />95% CD Submittal (Plan Check) 4 Weeks from receipt of comments <br />100% CD's (Permit Issued) 2 Weeks from receipt of comments <br />Bidding Approximately 6 Weeks <br />Construction Administration Ongoing throughout 40 Weeks (approximately) <br />Record Drawings 2 Weeks from City Acceptance of Project Construction <br />CSA Glass Architects Page 7 of 18 <br />Boys & Girls Club Pool Project No. ] 50-69-202 <br />