My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 Harris Design (3)
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 Harris Design (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2009 8:52:49 AM
Creation date
8/17/2009 8:52:48 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
6/2/2003
Retention
PERM
Document Relationships
Reso 2003-129
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />SCOPE OF SERVICES <br />Introduction: <br />This contract is for the design of a new play area . at Memorial Park. The scope of the <br />improvements is limited to the items listed below. Design of additional construction scope items <br />is not included in this scope of services, but could be provided as additional services with <br />additional compensation. The estimated construction value of these improvements is <br />approximately $185,000. <br />• Demolition of existing improvements <br />• New play equipment and surfacing <br />• Grading and minor drainage <br />• Site Furniture <br />• Pathways <br />• Planting <br />• Irrigation <br />• Trash receptacles <br />1,0 Public Outreach and Schematic Design: <br />• Services currently being provided under a different purchase order <br />2.0 Design Development (30% PSE) <br />2.01 Project Initiation Meeting <br />Meet with City Staff to review scope of the master-planned improvements and discuss <br />any desired modifications or additions. Walk site to review the existing conditions and <br />proposed locations for new and modified park elements. <br />2.02 Coordination with Play Equipment Manufacturers <br />Meet with City Staff and play equipment manufacturer's representative to finalize <br />selection of play equipment. Coordinate with representative throughout the project. <br />2.03 Prepare Preliminary Design Plans, Specifications, and Estimates <br />The following construction documents will be prepared. Drawings will be in AutoCAD <br />2002. Specifications will be in Microsoft Word. Estimates will be in Microsoft Excel. Up <br />to 5 sets of construction documents would be provided under the reimbursable expenses <br />allowance. <br />• Cover sheet <br />• Base sheet/ site layout plan <br />Grading and drainage plan <br />• Planting plan <br />Memarial Park Playground Renovation Page 3 of 18 <br />Contractual Services Agreement Project No. -- <br />
The URL can be used to link to this page
Your browser does not support the video tag.