My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 Harris Design (3)
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 Harris Design (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2009 8:52:49 AM
Creation date
8/17/2009 8:52:48 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
6/2/2003
Retention
PERM
Document Relationships
Reso 2003-129
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 ~ <br />• Construction details <br />• Outline specifications (technical sections only) <br />• Estimate of probable construction cost <br />2.04 Review with City Staff <br />Meet with City Staff to review the 30% submittal. <br />2.05 Revisions <br />Revise documents as necessary. <br />2.06 City CouncillPublic Review <br />Present design at one public meeting. <br />3.0 Construction Documents <br />3.01 Staff Coordination Meeting <br />Meet with City Staff to review scope of the project as shown on the approved design <br />development documents. Discuss results of City Council and public review, along with <br />any desired modifications or additions. Walk site if desired with Staff to review detailed <br />design issues as appropriate. <br />3.02 Construction Documents (70% submittal) <br />The following construction documents will be prepared. Drawings will be in AutoCAD <br />20001. Specifications will be in Microsoft Word. Estimates will be in Microsoft Excel. <br />Up to five sets of construction documents will be provided under the reimbursable <br />expenses allowance. <br />• Cover sheet <br />• Demolition plan <br />• Site layout plan <br />• Play area enlargement layout plan <br />• Grading and drainage plan <br />• Irrigation plan <br />• Irrigation details <br />• Planting plan <br />• Planting details <br />• Construction details <br />• Technical specification sections <br />• Front-end Specifications- City Boilerplate <br />• Estimate of probable construction cost <br />3.03 Review with City Staff <br />Meet with City Staff to review the 70% submittal. <br />Memorial Park Playground Renovation <br />Contractual Services Agreement <br />Page 4 of 18 <br />Project No. -_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.