Laserfiche WebLink
1 ~ <br />• Construction details <br />• Outline specifications (technical sections only) <br />• Estimate of probable construction cost <br />2.04 Review with City Staff <br />Meet with City Staff to review the 30% submittal. <br />2.05 Revisions <br />Revise documents as necessary. <br />2.06 City CouncillPublic Review <br />Present design at one public meeting. <br />3.0 Construction Documents <br />3.01 Staff Coordination Meeting <br />Meet with City Staff to review scope of the project as shown on the approved design <br />development documents. Discuss results of City Council and public review, along with <br />any desired modifications or additions. Walk site if desired with Staff to review detailed <br />design issues as appropriate. <br />3.02 Construction Documents (70% submittal) <br />The following construction documents will be prepared. Drawings will be in AutoCAD <br />20001. Specifications will be in Microsoft Word. Estimates will be in Microsoft Excel. <br />Up to five sets of construction documents will be provided under the reimbursable <br />expenses allowance. <br />• Cover sheet <br />• Demolition plan <br />• Site layout plan <br />• Play area enlargement layout plan <br />• Grading and drainage plan <br />• Irrigation plan <br />• Irrigation details <br />• Planting plan <br />• Planting details <br />• Construction details <br />• Technical specification sections <br />• Front-end Specifications- City Boilerplate <br />• Estimate of probable construction cost <br />3.03 Review with City Staff <br />Meet with City Staff to review the 70% submittal. <br />Memorial Park Playground Renovation <br />Contractual Services Agreement <br />Page 4 of 18 <br />Project No. -_ <br />