My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 Harris Design (3)
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 Harris Design (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2009 8:52:49 AM
Creation date
8/17/2009 8:52:48 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
6/2/2003
Retention
PERM
Document Relationships
Reso 2003-129
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Deliverables: <br />1. Plans: Construction documents will include demolition plan, site layout plan, play area <br />enlargement layout plan, grading and drainage plan, irrigation plan and details, planting plan <br />and details, and construction details sufficiently detailed for competitive bidding and proper <br />execution of the proposed improvements. <br />a. Preliminary submittals: Submit five sets of construction drawings on City standard <br />24x36 title block. <br />b. Final submittal: Submit one set of construction drawings on City standard 24x36 title <br />block stamped and signed by licensed designers as appropriate on vellum. Also provide <br />an electronic file in AutoCAD 2000 version of the final construction documents. <br />2. Specifications: One set of unbound specifications on hardcopy and Microsoft Word 6.0 <br />electronic file; both in City standard format. <br />3. Detailed estimate of construction cost at each submittal. <br />City Tasks: <br />• Provide base specifications <br />• Provide title block in AutoCAD 2000 electronic file format <br />• Review 30% construction document set, and provide comments <br />• Review 70% construction document set, and provide comments <br />• Review 90% construction document set, and provide comments <br />• Pay City's permit fees <br />• Route construction document sets to appropriate City personnel for review <br />• Provide topographic survey of park site in AutoCAD 2000 format <br />Memorial Park Playground Renovation Page 6 of 18 <br />Contractual Services Agreement Project No. -- <br />
The URL can be used to link to this page
Your browser does not support the video tag.