My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 Winzler & Kelly Consulting Engineers
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 Winzler & Kelly Consulting Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2009 9:35:39 AM
Creation date
8/17/2009 9:13:14 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
6/16/2003
Retention
PERM
Document Relationships
Reso 2003-135
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />SCOPE OF SERVICES <br />1.0 <br />DESCRIPTION OF PROJECT <br />Contractor shall provide design services for the completion of construction documents for <br />street renovations along West Estudillo Avenue in San Leandro, extending from San <br />Leandro Boulevard to Hays Street and through the Washington Plaza shopping center to <br />East 14t~ Street. This project includes the following streetscape and pedestrian <br />improvements: <br />• Street corner bulb-outs and curb planter islands <br />• Decorative street lighting <br />• Decorative pedestrian crosswalk paving and ADA ramps <br />• Street trees, landscaping and irrigation <br />• Historic markers and stations along the pathway <br />• Ornamental pedestrian gateway arch and AC Transit bus shelter <br />• Sidewalk and driveway reconstruction as necessary <br />• Sidewalk zone improvements along the east side of San Leandro Boulevard <br />between West Estudillo Ave and the BART Station cross walk (approx. 180 lineal <br />feet). This area to receive streetscape, planting, and irrigation improvements <br />• Landmark features at entrance to the Washington Square Plaza <br />• Design of Bell Monument modifications to the Washington Square Plaza area <br />In addition to the streetscape pedestrian improvements described above, this project will <br />include the following: <br />• Reconstruction of West Estudillo Avenue from Carpentier Avenue to Hays Street <br />(approximately 7001f) to remove an accentuated crown along the street centerline <br />• Extension of an existing storm drain along West Estudillo Avenue approximately <br />300' east of Clarke Street. <br />• New decorative streetlights and undergrounding of existing overhead utility lines. <br />The estimate of probable construction cost for the total project is $2,483,000, with a <br />breakdown as follows: <br />West Estudillo Streetscape /Pedestrian Improvements $1,362,188 <br />Street Reconstruction $ 258,204 <br />Utility Undergrounding <br />Public $ 812,968 <br />Private Connections $ 50,000 <br />Total $2,483,360 <br />CSA-Winzler and Kelly Page 3 of 25 <br />West Estudillo/Historic Downtown Improvement Project No. 961-86-045 <br />
The URL can be used to link to this page
Your browser does not support the video tag.