Laserfiche WebLink
C-6 Layout & Profile (1" = 20'H,1"=4'V) and cross-sections at SO' -Clarke (1/2 Sheet) <br />C-~ Civil Details <br />C-g Gateway -Civil/Structural <br />C-9 pavement Delineation & Signing- West Estudillo (Street Reconstruction Area) <br />C-10 Custom Bus Shelter- Foundation Plan /Structural Layout <br />G 11 Custom Bus Shelter- Electrical /Misc. Details <br />U-1 Utility Undergrounding/ Street Lighting Layout & Profiles-West Estudillo Ave <br />U-2 Utility Undergrounding/ Street Lighting Layout & Profiles-West Estudillo Ave <br />U-3 Utility Undergrounding/ Street Lighting Layout & Profiles-Side Streets <br />U-5 Utility Undergrounding/ Street Lighting Details <br />U-6 Utility Undergrounding/ Street Lighting Vault Cover Details <br />L-1 Landscape/Planting Layout (1" = 20'H)-San Leandro Blvd <br />L-2 Landscape/Planting Layout (1" = 20'H)-West Estudillo Ave <br />L-3 Landscape/Planting Layout (1" = 20'H)-West Estudillo Ave <br />L-4 Landscape/Planting Layout (1" = 20'H)-Hays St to East 14th St <br />L-5 Landscape/Planting Layout (1" = 20'H)-Washington Square Plaza <br />L-6 Landscape/Planting - Details <br />L-7 Landscape/Irrigation Layout (1" = 20'H)-San Leandro Blvd <br />L-8 Landscape/Irrigation Layout (1" = 20'H)-West Estudillo Ave <br />L-9 Landscape/Irrigation Layout (1" = 20'H)-West Estudillo Ave <br />L-10 Landscape/Irrigation Layout (1" = 20'H)-Hays St to East 14th St <br />L-11 Landscape/Irrigation Layout (1" = 20'H)-Washington Square Plaza <br />L-12 Landscape/Irrigation - Details <br />L-13 Landscape/Irrigation - Details <br />L-14 Gateway Feature <br />L-15 Gateway Feature <br />L-16 Landmark- Washington Square <br />L-17 Landmark- Washington Square <br />L-1$ Landscape Enlarged Details (1/8 Scale) <br />L-19 Landscape Enlarged Details (1/8 Scale) <br />L-20 Landscape -Bus Shelter <br />L-21 Landscape -Bus Shelter,Bell Monument <br />L-22 Landscape Site Furniture <br />Deliverable: Ten (10) copier of 70% PS&E. <br />4.2 Coordination Meetings <br />Contractor shall attend and prepare minutes of three (3) meetings with City staff. <br />4.3 Public Meetings <br />Contractor shall prepare presentation material and attend two special /public meetings. <br />Present Design Report and Schematic Design. The City shall provide public notification. <br />CSA-Winzler and Kelly Page 9 of 25 <br />West Estudillo/Historic Downtown Improvement Project No. 961-86-045 <br />