My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 Creegan DAngelo Consulting & Structural Engineers
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 Creegan DAngelo Consulting & Structural Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2009 4:44:07 PM
Creation date
8/17/2009 9:30:09 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
6/16/2003
Retention
PERM
Document Relationships
Reso 2003-138
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Tasks: <br />• Provide curb and gutter grades for storm flow elevation. <br />• Provide bridge data and other information as available. <br />• Review and comment on Phase 1 documents. <br />• Select repair and protection plan from phase one proposed remedies. <br />PHASE TWO, Construction Documents and Permits. <br />Product: <br />• Construction Drawings on City standard 22x34 title block 65% completion -2 sets <br />• Construction Drawings on City standard 22x34 title block 100% completion, stamped 2- <br />sets and signed by licensed designers as appropriate, + vellum. <br />• ACRD v.14 compatible electronic files of the 100% CD documents. <br />• Technical Specifications in both hard copy and electronic format. <br />• Prepare Project Cost Opinion based on Final CDs <br />• Supporting calculations (as applicable) <br />• Permits <br />Contractor Tasks: <br />• Deliver 65% CD drawings for review and comment <br />• Incorporate comments into 100% CD drawings <br />• Deliver 100% CD drawings and Technical Specifications for review and comment <br />• Submit permit applications (City will provide all permit application payments payable to <br />agency), monitor progress and provide bi-weekly permit process update. <br />• Deliver Final CD's <br />• -Pull final permit when permits are issued. <br />City Tasks: <br />• Provide permit application payments. <br />• Provide front end "boiler plate" bid document in electronic format. <br />• Review 65% CD set and provide comments. <br />• Review 100% CD set and provide comments. <br />PHASE THREE, Construction Observation and Contract Administration <br />Consultant Tasks: <br />• Attend Pre-Construction Conference <br />• Make site visits at key construction. stages. <br />• Review Contractor's submittals for conformance to the design concept. <br />Prepare RFI's and supplemental instructions for minor changes to work as needed. <br />CSA Neptune Bridge Page 4 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.