Laserfiche WebLink
EXHIBIT A <br />SCOPE OF SER~IICES <br />The Bonaire Fark Playground Improvement project consists of completing professional services <br />for the following: <br />• Upgrade the existing playground area including replacement play structures to <br />accommodate children aged 5-12 and meet current CSPC standards. <br />• Construct accessible pathways to play area and picnic areas. <br />• Install accessible picnic tables and barbecues. <br />Replace concrete pads beneath picnic tables. <br />• Expand the parking lot by approximately 9,000 sf. <br />• Enhance the park entrance. <br />• Install shade trees around parking lot, at islands and at the picnic areas. <br />• Provide irrigation for new shade trees. <br />• Attend two neighborhood meetings to address local residents concerns. <br />Public Outreach and Preliminary Plan: <br />1.0 PUBLIC OUTREACH <br />1.01 Project Initiation Meeting/Site Reconnaissance: Meet with City Staff to review scope <br />of the improvements and discuss any desired modifications or additions. Walk site to <br />review the existing conditions and proposed locations for new and modified park <br />elements. <br />1.02 Neighborhood Public Meeting: An initial neighborhood workshop will be facilitated by <br />the consultant and Director. The purpose of the meeting will be to identify neighborhood <br />concerns and preferences regarding the play equipment selections and overall park <br />design. The consultant will facilitate the meeting and record all comments. The <br />consultant will also transcribe all meeting comments and distribute to the City. <br />2.0 PRELIlVIINARY DESIGN <br />2.01 Preliminary Design: Prepare schematic/preliminary design, render plan in color. Provide <br />information on park equipment. <br />2.02 Cost Estimate: Prepare estimate of probable construction costs. <br />2.03 City Staff Review: Meet with City Staffto review the schematic/preliminary design and <br />discuss direction for desired modifications. <br />2.04 Revisions: Revise drawings as necessary. <br />CSA CALLANDER ASSOCIATES Pagc 3 of 23 <br />Bonaire Park Playground Renovation <br />