My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 MV Transportation Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 MV Transportation Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2009 9:17:59 AM
Creation date
8/18/2009 9:17:58 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
8/1/2003
Retention
PERM
Document Relationships
Reso 2003-155
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />SCOPE OF SERVICES <br />I. DESCRIPTION OF SYSTEM <br />A. Background <br />The City of San Leandro receives Measure B Paratransit funds to provide specialized <br />transportation for people with disabilities and seniors. The purpose of these funds is to <br />allow cities to supplement, not replace, the mandated paratransit services operated by <br />AC Transit and BART through East Bay Paratransit. <br />When Alameda County voters reauthorized the Measure B funds, San Leandro's City <br />Council approved a plan to conduct a Measure B Paratransit Master Plan Study to <br />develop and evaluate Measure B Paratransit service options. The study has been <br />completed and City Council approved the implementation of a Flex-Route Shuttle <br />option. The service will initially be implemented as a six month pilot program. The <br />pilot program will allow prompt implementation of the service and program flexibility. <br />The Alameda County Transportation Improvement Authority (ACTIA) authorizes an <br />annual Measure B Paratransif budget for each city based on anticipated sales tax <br />revenues. <br />B. Service Description <br />The Measure B Paratransit service will operate three days per week as apoint-deviation, <br />Flex-Route Shuttle. The Flex-Route Shuttle service area includes all locations within <br />the San Leandro city limits and is divided into a west and east side (Refer to Figure 1). <br />The Flex-Route Shuttle combines both fixed route and demand response features. It is <br />essentially a demand response service, structured on a framework of fixed, scheduled <br />time points to offer some walk-on flexibility and increased productivity. A flex-route <br />service controls when a bus is available in each portion of the service area and structures <br />the direction that the service travels to facilitate more productive, demand response trip <br />request assignments. <br />Two buses will operate on a 60 minute headway. Scheduled time points will be <br />established at key locations within San Leandro. The scheduled time points will form a <br />"one-way loop" framework-fora 60 minute clock face schedule, and serve as formal,bus <br />stops for passengers to use the service aswalk-ons, not requiring a reservation. <br />EXHIBIT A Page 1 of 13 <br />G:\Oliver\ParatransitWlV Contract Aug 03 -Feb 04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.