Laserfiche WebLink
Since the effort required during construction can not be determined in advance, <br />Contractor has proposed to work with the City on a time and materials basis for <br />construction services. Contractor recommends that a budget be established for its <br />services as indicated on the attached spreadsheet. <br />CSA-BKF MacArthur Streetscape Page 6 of 23 <br />Revised x/02 <br />