Laserfiche WebLink
• Final cost estimate and drawing submittal <br />• Three design team meetings with City staff <br />• Project administration and quality control review <br />Deliverables <br />Deliverables will consist of eight (8) sets of full size plan sets and specification <br />package with all supporting documents. <br />Schedule <br />9S% Plans, Specifications and Estimates 6 weeks from receipt of City s 70% <br />PS&E review comments <br />See attached schedule (Exhibit A-1) for breakdown <br />Task 4 100% Bid Documents: Any changes that are identified in the 95% review will be <br />incorporated in the plans to produce the final set of construction documents. The <br />quantity list will be modified if necessary and the plans completed. <br />Specific tasks to be performed during this phase will include: <br />• Incorporate comments <br />• Three meetings with City staff <br />• Design completion and bid package submittal <br />• Reviews and project management <br />Deliverables <br />Deliverables will consist of signed reproducible plans and specifications ready to bid. <br />Schedule <br />100% Plans, Specifications and Estimates 5 weeks from receipt of City's 95% <br />PS&E review comments <br />See attached schedule (Exhibit A-1) for breakdown <br />Bidding and Construction Services <br />Task 1 Bidding and Award: Contractor shall attend apre-construction meeting that will be <br />held at the City's offices. If necessary, an addendum will be issued to the Contractor <br />clarifying any issues that may need clarification on the plans after the pre-bid <br />meeting. <br />Task 2 Construction Services: The Contractar shall assist in shop drawing review and have <br />budgeted up to ten (10) site meetings to review issues and assist the City in the punch <br />list review when the project approaches completion. The Contractor shall assist the <br />Cite staff in construction administration if necessary. <br />CSA-BKF MacArthur Streetscape Page 5 of 23 <br />Revised 5/02 <br />