My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 BKF Engineers (2)
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 BKF Engineers (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2009 10:03:06 AM
Creation date
8/18/2009 10:03:05 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
7/21/2003
Retention
PERM
Document Relationships
Reso 2003-173
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Final cost estimate and drawing submittal <br />• Three design team meetings with City staff <br />• Project administration and quality control review <br />Deliverables <br />Deliverables will consist of eight (8) sets of full size plan sets and specification <br />package with all supporting documents. <br />Schedule <br />9S% Plans, Specifications and Estimates 6 weeks from receipt of City s 70% <br />PS&E review comments <br />See attached schedule (Exhibit A-1) for breakdown <br />Task 4 100% Bid Documents: Any changes that are identified in the 95% review will be <br />incorporated in the plans to produce the final set of construction documents. The <br />quantity list will be modified if necessary and the plans completed. <br />Specific tasks to be performed during this phase will include: <br />• Incorporate comments <br />• Three meetings with City staff <br />• Design completion and bid package submittal <br />• Reviews and project management <br />Deliverables <br />Deliverables will consist of signed reproducible plans and specifications ready to bid. <br />Schedule <br />100% Plans, Specifications and Estimates 5 weeks from receipt of City's 95% <br />PS&E review comments <br />See attached schedule (Exhibit A-1) for breakdown <br />Bidding and Construction Services <br />Task 1 Bidding and Award: Contractor shall attend apre-construction meeting that will be <br />held at the City's offices. If necessary, an addendum will be issued to the Contractor <br />clarifying any issues that may need clarification on the plans after the pre-bid <br />meeting. <br />Task 2 Construction Services: The Contractar shall assist in shop drawing review and have <br />budgeted up to ten (10) site meetings to review issues and assist the City in the punch <br />list review when the project approaches completion. The Contractor shall assist the <br />Cite staff in construction administration if necessary. <br />CSA-BKF MacArthur Streetscape Page 5 of 23 <br />Revised 5/02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.