Laserfiche WebLink
EXHIBIT A <br />SCOPE OF SERVICES <br />DESCRIPTION <br />This project consists of completing professional services for the replacement of the existing Fuel <br />Dock at San Leandro Marina. <br />• The existing Fuel Dock is to be removed and replaced with a prefabricated concrete <br />floating dock relocated near the edge of the existing dock line and federal channel. <br />• Anew prefabricated attendant shed (approximately 5'x 8') will be installed on the dock. <br />• Anew access to the fuel dock, complying with ADA requirements, will be added. <br />• Existing fuel dispensers are to be relocated and reused. New underground fuel delivery <br />lines are to be installed between the existing tank (to remain) and the waterline, and new <br />flexible fuel lines from the waterline to the dispensers. <br />• Other existing facilities will be extended to the new dock location reusing existing <br />components when possible. <br />SCOPE OF REQUIRED SERVICES <br />Task 1 -Contract Documents <br />Continuing from the approved preliminary plan, the Contractor will prepare plans and technical <br />specifications for bidding purposes. <br />The plans will consist of: <br />• Cover Sheet <br />• Existing Site Conditions <br />• Demolition Plan <br />• Layout Sheet showing the proposed improvements <br />• Plan and Details for Floats and Piling <br />• Plan and Details for Accessible Gangway <br />•~ Plan and Details for Landside Piping Layout and Connections <br />• Plan and Details for utilities on fuel dock and connections to landside services <br />• Details for Dispensers and Sewage Pumpout (dismantling, storage and relocation). <br />• Domestic and Fire Water Layout and Details <br />Contractual Services Agreement Page 3 of 16 <br />Account #597-57-197 Rebuild Fuel Dock <br />