My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 Concept Marine Associates Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 Concept Marine Associates Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2009 10:11:54 AM
Creation date
8/18/2009 10:11:53 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
7/21/2003
Retention
PERM
Document Relationships
Reso 2003-175
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />SCOPE OF SERVICES <br />DESCRIPTION <br />This project consists of completing professional services for the replacement of the existing Fuel <br />Dock at San Leandro Marina. <br />• The existing Fuel Dock is to be removed and replaced with a prefabricated concrete <br />floating dock relocated near the edge of the existing dock line and federal channel. <br />• Anew prefabricated attendant shed (approximately 5'x 8') will be installed on the dock. <br />• Anew access to the fuel dock, complying with ADA requirements, will be added. <br />• Existing fuel dispensers are to be relocated and reused. New underground fuel delivery <br />lines are to be installed between the existing tank (to remain) and the waterline, and new <br />flexible fuel lines from the waterline to the dispensers. <br />• Other existing facilities will be extended to the new dock location reusing existing <br />components when possible. <br />SCOPE OF REQUIRED SERVICES <br />Task 1 -Contract Documents <br />Continuing from the approved preliminary plan, the Contractor will prepare plans and technical <br />specifications for bidding purposes. <br />The plans will consist of: <br />• Cover Sheet <br />• Existing Site Conditions <br />• Demolition Plan <br />• Layout Sheet showing the proposed improvements <br />• Plan and Details for Floats and Piling <br />• Plan and Details for Accessible Gangway <br />•~ Plan and Details for Landside Piping Layout and Connections <br />• Plan and Details for utilities on fuel dock and connections to landside services <br />• Details for Dispensers and Sewage Pumpout (dismantling, storage and relocation). <br />• Domestic and Fire Water Layout and Details <br />Contractual Services Agreement Page 3 of 16 <br />Account #597-57-197 Rebuild Fuel Dock <br />
The URL can be used to link to this page
Your browser does not support the video tag.