My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 John Cahalan Landscape Architects
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 John Cahalan Landscape Architects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2009 11:17:33 AM
Creation date
8/18/2009 11:17:32 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
9/2/2003
Retention
PERM
Document Relationships
Reso 2003-187
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.9 Construction Details: Prepare construction details for proposed improvements <br />described above under "2.04 through 2.07" (approximately 6 sheets of details) <br />2.10 70% Submittal: Prepare 70% complete construction documents (AutoCAD version <br />2000 or newer), specifications ("Greenbook")per City's standard format, and cost <br />estimate. <br />2.11 90% Submittal: Incorporate comments from previous submittal and prepare 90% <br />complete construction documents, specifications per City's format, and cost estimate. <br />2.12 100% Submittal: Incorporate comments from previous submittal and prepare 100% <br />complete construction documents and specifications per City's format. <br />2.13 Final Cost Estimate: Prepare final estimate of probable project costs as both an <br />itemized estimate and in bid format. <br />Phase 3 - Bidding & Construction Administration <br />3.01 Pre-bid Meeting: Attend apre-bid meeting for interested bidders to address any <br />questions or concerns regarding the project scope and schedule. <br />3.02 Addenda: Prepare addenda as needed during bidding. <br />3.03 Pre-construction meeting: Attend apre-construction meeting with selected contractor <br />to address any questions or issues with City and contractor. <br />3.04 Submittals/Contractor RFI's: Review required submittals and respond to RFI's on an <br />"as needed" basis during project construction. <br />3.05 Construction Review: Conduct site visits to help monitor contractor compliance with <br />the plans and specifications. Four (4) by Landscape Architect, two (2) by the Civil <br />Engineer and one (1) by the Electrical Engineer. <br />Schedule: <br />Submit 70% Construction Documents <br />and Cost Estimate <br />8 weeks from receipt of <br />Notice to Proceed <br />Submit 90% Construction Documents <br />and Cost Estimate <br />Submit 100% Construction Documents <br />and Cost Estimate <br />3 weeks from receipt of <br />City's comments on 70% PS&E <br />3 weeks from receipt of <br />City's comments on 90% PS&E <br />CSA/John Cahalan Landscape <br />Lewelling Boulevard Landscape Median <br />Page 4 of 19 <br />Projeck No. 210-38-231 <br />
The URL can be used to link to this page
Your browser does not support the video tag.