My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 Winzler & Kelly Consulting Engineers (2)
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 Winzler & Kelly Consulting Engineers (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2009 4:41:26 PM
Creation date
8/19/2009 9:33:35 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
11/3/2003
Retention
PERM
Document Relationships
Reso 2003-223
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L-13 Landscape Site Furniture <br />4.4 Coordination Meetings <br />Contractor shall attend and prepare minutes of three (3) meetings with City staff. <br />These meetings are assumed to occur at the same time as meetings for the East 14~` Street <br />Project. <br />4. S Public Meetings <br />Contractor shall prepare presentation material and attend two special /public meetings. <br />Present Design Report and Schematic Design. The City shall provide public notification. <br />Presentation materials include graphic boards and power point presentation. Consultant <br />will prepare minutes of the meetings. <br />These meetings are assumed to occur at the same time as meetings for the East 14th Street <br />Project. <br />4.6 Comment Response Report <br />Contractor shall meet with City, review draft response to Concept Design Report <br />comment and prepare letter report that will be a compilation of all agency comments with <br />responses cited immediately below each comment. City to provide initial priorities for <br />sizing project to meet City Budgetary constraints. Issue report one week after meeting. <br />4.7 Permitting/Approvals Submittal <br />Project documents shall be submitted by Contractor to permitting and approving agencies <br />as well as all utility companies to continue coordination. <br />4.8 Design Management <br />Contractor shall provide overall project management and maintain effective <br />communications with the City project staff. With each monthly invoice, Contractor shall <br />provide a project status report that outlines work completed and budget expenditures, as <br />well as an updated project schedule. <br />Deliverable: Monthly Status Reports <br />5.0 CONSTRUCTION DOCUMENTS / 70% DESIGN <br />5.1 Design <br />CSA-Winzler and Kelly Page 12 of 30 <br />Downtown Lighting and Pedestrian Enhancements Project No. 961-83-054 <br />
The URL can be used to link to this page
Your browser does not support the video tag.