My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 Winzler & Kelly Consulting Engineers (2)
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 Winzler & Kelly Consulting Engineers (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2009 4:41:26 PM
Creation date
8/19/2009 9:33:35 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
11/3/2003
Retention
PERM
Document Relationships
Reso 2003-223
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor shall prepare 70% complete construction documents. The layout sheets shall <br />show the utilities and improvement in screened background for coordination purposes. <br />Draft specification shall be provided Estimates of probable construction costs shall be <br />provided with the work defined by same component areas utilized in 30% Submittal. . <br />The plans to be developed shall be the same as those specified in 4.3 above ,with <br />exception that the trash enclosure project as follows: <br />Trash Enclosure: <br />G-1 Title Sheet /Legend /Abbreviations <br />G-2 Key Map /General Notes <br />C-1 Trash Compactor /Trash Facility Site Improvements and Utility Plan <br />C-2 Civil/Structural Details /Demolition Details <br />E-1 Electrical <br />These plans will follow the preparation of a brief conceptual study for the location of the <br />Trash Collection Facility. Three Alternatives will be evaluated. <br />5.2 Coordination Meetings <br />Contractor shall attend and prepare minutes of two (2) meetings with City staff. <br />These meetings are assumed to occur at the same time as meetings for the East 14th Street <br />Project. <br />5.3 Public Meetings <br />These meetings are assumed to occur at the same time as meetings for the East 14th Street <br />Project. <br />Contractor shall prepare presentation material and attend one special/public meetings. <br />Present Design Report and Schematic Design. The City shall provide public notification. <br />Presentation materials include graphic boards and power point presentation. Consultant <br />will prepare minutes of the meetings <br />5.4 Comment Response Report <br />Contractor shall meet with City, review draft response to 30% Submittal comments and <br />prepare letter report that will be a compilation of all agency comments with responses <br />CSA-Winzler and Kelly Page 13 of 30 <br />Downtown Lighting and Pedestrian Enhancements Project No, 961-83-05A <br />
The URL can be used to link to this page
Your browser does not support the video tag.