Laserfiche WebLink
e <br />WSM Westerly Lane (Safeway Store) as defined by Figure 1 (attached). These specific areas <br />will receive the following streetscape and pedestrian improvements: <br />• Decorative street lighting <br />• Decorative pedestrian crosswalk paving and ADA ramps <br />• Street trees, landscaping and irrigation <br />• Historic markers and stations along the pathway <br />• Sidewalk, parking lot and driveway reconstruction as necessary <br />• Trash Compactor Site with concrete pad and power <br />• Reconstruction of access road into the Starbucks /Taco Bell building with <br />diagonal parking and increase areas for outside seating. <br />• Pedestrian improvements to driveway, parking areas and pedestrian corridors in <br />the West Joaquin study area <br />• Removal of existing Trash Collection Facilities by the liquor store and <br />Sergios parkling lot and construction of a Trash Collection Facility with storage <br />for multiple containers <br />• Incorporation and revision of prior consultant's conceptual designs for the above <br />areas. <br />The estimate of probable construction cost for the entire project improvements described <br />above is $2,100,000. <br />Furthermore, the preparation of design and construction documents will be completed on <br />a separate and accelerated schedule for the following selected high priority items: <br />• Removal of existing Trash Collection Facilities by the liquor store and Sergios <br />parking lot ,construction of a Trash Collection Facility with storage for multiple <br />containers, and construction of a screened Trash Compactor concrete pad with <br />power and sanitary sewer drain. <br />CSA-Winzler and Kelly <br />Downtown Lighting and Pedestrian Enhancements <br />Page 4 of 30 <br />Project No. 961-83-054 <br />