Laserfiche WebLink
EXHIBIT A <br />SCOPE OF SERVICES <br />Introduction: <br />This contract is for the design development of Monarch Bay Drive from Marina Boulevard to <br />Fairway Drive. Scope of services will be based upon the concept design summarized in the San <br />Leandro Marina Connections Plan, dated April 2003 and the Concept Plan prepared by John <br />Cahalan Landscape Architect dated October 17, 2002 for the roundabout at Monarch Bay Drive and <br />Fairway Drive. <br />Task I: Community Outreach: Refinement and Revision of Concept Design <br />During this Task, the concept design established in the Connections Plan will be reviewed with <br />various city departments and the community. The concept design will be revised as necessary to <br />address community needs as well as known budget constraints. <br />Task I.1: Project Kick-off Meeting <br />A "kick-off' meeting will be held with City staff to review the design concepts proposed in the <br />Connections Plan and discuss potential technical issues, programmatic and design revisions, <br />project scope, and scheduling. <br />Task L2: Community Outreach Meeting <br />The City will notify all property/business owners within and adjacent to the project area, <br />community interest groups, and organizations that have particular interest in the project outcome. <br />Owners and other interested parties will be invited to attend an informational meeting, during <br />which the City and members of the Contractor will provide an update on the current scope of <br />work and project schedule. Property and business owners will be asked to identify issues and <br />opportunities to be addressed as the project moves into final stages of design documentation. <br />Task II Meetings with City Staff <br />Regular meetings will be held with the City staff to review project progress and address issues <br />that arise during the course of the work. Four scheduled meetings with City staff will be held, at <br />monthly intervals or as determined by the final project schedule. The project will commence <br />with a kickoff meeting to finalize the scope of work, schedule and budget for the project. <br />Task III Topographic Survey <br />An aerial topographic survey will be prepared with aone-foot contour interval along an <br />approximately 800-foot wide strip within the project area, centered on the centerline of existing <br />Monarch Bay Drive, at a scale of 1" = 20'. The Contractor will compile information on the base <br />maps that is vital to project planning, design, and ultimate construction of improvements. This <br />task will be conducted concurrently with the early stages of Tasks I, N, and V. <br />To supplement the Topographic Survey, field surveys will be conducted, where possible, to <br />determine inverts of existing utilities where modification may be required. Field surveys will <br />Contractual Services Agreement Page 3 of 19 <br />Monarch Bay Drive/Fairway Drive to Marina Boulevard Project No. 120-38-243 <br />