Task 1 Project Management/Team Leadership <br />Task 1.1 Prepare and monitor progress schedule and budget <br />Task 1.2 Attend monthly meetings with City <br />Task 1.3 Attend community meetings (assume 2 meetings) <br />Task 1.4 Prepare monthly progress report <br />Task 1.5 Coordinate design with team members, Caltrans, City and Utility Owners <br />Task 1.6 Supervise design development <br />Project duration is assumed to be 10 months. <br />It is assumed that there will be 2 Caltrans submittals and 1 final encroachment permit submittal. <br />No construction support or administration has been included in the project scope of services. <br />TASK PIC Sr PM PM Enq III Enq II Enq I Cler Tech Surv Tot Hrs Cost <br />Task 1.1 16 32 8 56 $7,496 <br />Task 1.2 20 20 40 $5,720 <br />Task 1.3 16 8 12 36 $4,680 <br />Task 1.4 4 24 18 46 5,666 <br />Task 1.5 36 94 48 32 20 230 27,936 <br />Task 1.6 42 86 24 152 20,260 <br />Subtotal 134 0 264 98 32 0 0 32 0 560 $71,758 <br />Task 2 Preliminary Investigations/Data Collection <br />Task 2.1 Collect and review available data, as-builts, and reports <br />Task 2.2 Prepare geometric altematives for the connections at Davis SU Westgate Pkwy,Davis St /Timothy Dr, & WestgatePkwy/Timothy Dr <br />Task 2.3 Present altematives to City and Caltrans to establish preferred alternative <br />Task 2.4 Provide data to support envimomental document -This item has been deleted from scope. <br />Task 2.5 Perform additional field surveys and verify pavement elevations at conforms <br />Task 2.6 Perform supplemental field investigations <br />City shall provide aerial photo base. Aerial photography is excluded from the project scope. <br />Geotechnical work does not include analysis for ADL material. <br />Project Scope does not include Utility Potholing. <br />TASK PIC Sr PM PM Enq III Enq II Enq I Cler Tech Surv Tot Hrs Cost <br />Task 2.1 4 16 10 24 10 8 72 $7,700 <br />Task 2.2 4 20 46 12 6 12 100 $11,008 <br />Task 2.3 6 10 20 8 8 52 $5,936 <br />Task 2.4 0 $0 <br />Task 2.5 16 8 84 108 $19,216 <br />Task 2.6 2 10 8 12 18 50 5 162 <br />Subtotal i6 0 72 92 56 34 0 28 84 382 $49,022 <br />Task 3 30% PS&E Submittal (Design Development) <br />Task 3.1 Prepare project base sheets at 1"=40' scale on 22"x3 2 plan sheets <br />Task 3.2 Modify Base Sheets with supplemental survey data <br />Task 3.3 Confirm parking lot layouts and requirements <br />Task 3.4 Analyze hydrologic conditions and prepare drainage talcs <br />Task 3.5a Prepare layout sheets outlining geometric features <br />Task 3.5b Develop preliminary drainage design <br />Task 3.5c Prepare preliminary grading plan <br />Task 3.6 Prepare Outline of Project Specifications <br />Task 3.7 Develop 30% Construction Estimate <br />Task 3.8 Prepare Plans for 30% submittal <br />If is assumed that Hwy 880 ramp modifications are not required. <br />Project scope does not include Project Study Report or Project Report. <br />TASK PIC Sr PM PM Enq I II Enq I I Enq I Cler Tech Surv Tot Hrs Cost <br />Task 3.1 10 12 30 52 $5,120 <br />Task 3.2 8 10 92 110 $10,522 <br />Task 3.3 6 12 24 42 $4,404 <br />Task 3.4 4 20 12 36 $3,856 <br />Task 3.5a 8 6 12 20 18 64 $6,234 <br />Task 3.5b 8 4 24 32 14 82 $7,824 <br />Task 3.5c 12 10 40 24 10 96 $9,486 <br />Task 3.6 1 8 2 11 $1,400 <br />Task 3.7 4 4 6 18 6 38 $3,624 <br />Task 3.8 1 4 2 7 $858 <br />Subtotal 2 0 72 58 118 116 0 172 0 538 $53,328 <br />Page 18 of 38 <br />