My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 BKF Engineers
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 BKF Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2009 3:01:55 PM
Creation date
8/20/2009 3:01:54 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
3/3/2003
Retention
PERM
Document Relationships
Reso 2003-046
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 5 100% P58E Submittal <br />Task 5.1 Review and resolve 70% comments from City and Caltrans <br />Task 5.2 Attend comment resolution meeting with Caltrans <br />Task 5.3 Revise 70% submittal per Caltrans 8 City review comments <br />Task 5.4a Complete project plans <br />Task 5.4b Update & finalize reports <br />Task 5.4c Modify Project Specifications <br />Task 5.4d Prepare Final Quantities, Estimates 8 Schedule <br />Task 5.5 Conduct Independent Quality Control Review <br />Task 5.6 Prepare plans, details and talcs for 100% submittal <br />TASK PIC Sr PM PM Enq III Enq II Eng I Cler Tech Surv Tot Hrs Cost <br />Task 5.1 18 32 16 12 8 86 $10,528 <br />Task 5.2 6 8 6 20 $2,482 <br />Task 5.3 12 32 72 56 84 4 48 308 $31,108 <br />Task 5.4a 24 84 134 178 212 132 764 $76,844 <br />Task 5.4b 4 12 8 30 18 3 6 81 $8,358 <br />Task 5.4c 2 18 10 12 8 12 62 $6,106 <br />Task 5.4d 4 10 22 45 62 20 163 $15,825 <br />Task 5.5 24 12 36 $5,352 <br />Task 5.6 8 4 4 16 $1 740 <br />Subtotal 94 24 200 254 333 402 19 210 0 1536 $158,343 <br />Task 6 Final PSBE Submittal <br />Task 6.1 Review and resolve 100% comments from City and Caltrans <br />Task 6.2 Attend comment resolution meeting with Caltrans <br />Task 6.3 Revise 100% submittal per Caltrans & City review comments <br />Task 6.4 Prepare Final PS&E <br />Task 6.5 Prepare Right of Way Sufficiency Form <br />Task 6.6 Prepare Caltrans Encroachment Permit Application <br />Task 6.7 Package Documents for Bid <br />TASK PIC Sr PM PM Enq III Enq II Enq I Cler Tech Surv Tot Hrs Cost <br />Task 6.1 10 24 10 8 8 60 $7,198 <br />Task 6.2 6 8 6 20 $2,482 <br />Task 6.3 6 15 30 25 40 2 30 148 $14,875 <br />Task 6.4 8 32 48 48 86 6 54 282 27,910 <br />Task 6.5 2 8 2 12 1,510 <br />Task 6.6 4 2 6 682 <br />Task 6.7 2 8 4 4 18 2,056 <br />Subtotal 34 0 99 88 81 148 8 88 0 546 $56,713 <br />Task 7 Right of Way Documents for Access Control Break <br />Task 7.1 Convert Project Horizontal Datum to Caltrans std NAD 83 <br />Task 72 Prepare Plat and Legal for Access Control Break <br />Task 7.3 Prepare Directors Deed <br />Task 7.4 Prepare Documents for CTC Hearing <br />The Scope of Services does not include right of way documents such as Appraisal Maps, Hard Copy Maps, and Right of Way Record Maps. <br />TASK PIC Sr PM PM Enq_ III Enq II Enq I Cler Tech Surv Tot Hrs Cost <br />Task 7.1 2 10 24 18 54 $7,704 <br />Task 7.2 6 12 28 46 4,792 <br />Task 7.3 4 8 12 1,288 <br />Task 7.4 4 4 4 6 10 28 2,502 <br />Subtotal 6 0 24 36 40 6 10 0 18 140 $16,286 <br />Page 20 of 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.