My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 Glass Architects (2)
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 Glass Architects (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2009 5:16:28 PM
Creation date
8/20/2009 5:16:28 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
7/21/2003
Retention
PERM
Document Relationships
Reso 2003-183
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />SCOPE OF SERVICES <br />1.0 DESCRIPTION OF PROJECT <br />Contractor shall provide design services for replacement of an existing pool facility <br />located at Washington Manor Park in San Leandro, CA. <br />1. Demolition of the existing pools and bathhouse; alternate partially demolishing <br />existing pool house. <br />2. Installation of a new 25 yard x 25 meter pool. <br />3. Recreation pool with waterslide feature. <br />4. New pool house (approx. 5,000 sf). <br />5. Expanded parking lot for an additional 120 cars. <br />6. Associated site work, including utilities and landscaping. <br />7. Estimated construction cost of this project is $3.9 million. <br />2.0 CITY AND GENERAL REQUIREMENTS <br />2.1 Design Team <br />Contractor has proposed the following architects and design consultants and sub- <br />consultants: <br />GLASS ARCHITECTS <br />Architectural Design <br />ROWLEY INTERNATIONAL INC <br />Aquatic Design Consultant <br />DASSE DESIGN <br />Structural Engineer <br />O'MAHONY & MYER <br />Electrical Engineer <br />WARNECKE/ROSEKRANS <br />Landscape Architect <br />LEFLER ENGINEERING, INC <br />Mechanical Engineer <br />EBA ENGINEERING <br />Civil Engineer <br />SAYLOR CONSULTING GROUP <br />Cost Estimator <br />The Contractor shall be responsible to the City for the accuracy, quality and <br />performance of all subcontracted work; as well as to ensure coordination between <br />all design disciplines. Subcontractors may not be substituted without concurrence <br />from the City. The Contractor shall use qualified technicians and support staff for <br />the production of other functions to complete the work. The selected consultants <br />must maintain auditable records, documents and papers for inspection by <br />CSA Glass Architects <br />Washington Manor Park Pool <br />Page 3 of 20 <br />Project No. 210-62-002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.