Laserfiche WebLink
authorized City /Federal representatives for a minimum of three years after <br />project completion. <br />2.2 Design Requirements <br />This project shall meet all applicable code requirements including, but not limited <br />to the 2001 editions of the Uniform Building Code, California Building Code, <br />National Electrical Code, Uniform Plumbing Code and Uniform Mechanical <br />Code; as well as requirements of the Pacific Gas and Electric Company, East Bay <br />Municipal Utility District, Oro Loma Sanitary District, Alameda County Health <br />Department, City of San Leandro standards, and all other affected agencies and <br />utilities. <br />2.3 Format of Deliverables <br />All submittals and deliverables described below shall conform to the following: <br />• All construction drawings shall be provided to the City of San Leandro in <br />AutoCAD 2000 format <br />• Specifications and other written materials shall be provided to the City and <br />prepared in Microsoft Word 2000 format <br />• City shall prepare "front-end" specifications with standard and general <br />provisions. Contractor shall provide technical specifications following the <br />Construction Specification Institute (CS1) format. Specifications shall <br />provide at least two available products or brands as appropriate to comply <br />with "or equal" requirements; proprietary items to match existing City - <br />stocked maintenance parts shall also be so indicated <br />• Details shall conform to the City of San Leandro Standard Plans where <br />applicable <br />• Drawings shall be on City standard title block (22" x 34" size) <br />• Provide ten copies of all progress /review documents. Progress drawings <br />shall be on bond paper. Progress specifications shall be on double-sided <br />8.5 x 11 paper <br />• Construction /bid drawings shall be submitted on signed vellum sheets. <br />Sheets to be signed by all applicable sub-consultants. (City will bid project <br />and create/copy bid package) <br />2.4 Billing <br />Contractor invoices shall: <br />• Provide current billing expenses, as well as a running total of expenses, <br />payments received, invoices billed, and remaining balances on each <br />purchase order <br />• Provide an itemized invoice listing of billed reimbursable expenses, as well <br />as a running total of reimbursable expenses <br />CSA Glass Architects Page 4 of 20 <br />Washington Manor Park Pool Project No. 210-62-002 <br />