My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 Glass Architects (2)
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 Glass Architects (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2009 5:16:28 PM
Creation date
8/20/2009 5:16:28 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
7/21/2003
Retention
PERM
Document Relationships
Reso 2003-183
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d. Snackbar (The snackbar is assumed to be limited to pre-packaged <br />foods. Kitchen design is not required.) <br />4. Utilities: Contractor shall detail, specify and apply for new service <br />connections as necessary to Zelma Street. Off site street utilities are <br />assumed to be existing and adequate to serve the new project. <br />5. Estimated construction cost of this project is $2.85 million. Design Fees <br />are based upon project scope and budget. Changes in scope or budget may <br />affect the design fees. <br />6. Geotechnical Report will be obtained/provided by City. <br />7. Topo & Survey will be obtained/provided by City .in electronic media <br />(AutoCAD). <br />8. Security System Design is excluded. Coordination of infrastructure <br />(conduit &backboxes) is included. <br />9. Audio Visual Design is excluded. Coordination of infrastructure (conduit <br />&backboxes) is included. <br />10. TeUData Design is excluded; however, coordination of infrastructure <br />(conduit &backboxes) is included. Design of the TeUData system is <br />available as an additional service. <br />11. During schematic design, contractor shall assess the potential payback and <br />economic benefit of utilizing solar / photovoltaic energy systems. <br />However, detailed design of such energy systems (such as solar- <br />photovoltaic or solar water heating systems or emergency back-up <br />generator) is excluded. <br />12. Green Building Design (LEEDS certification) is excluded. <br />13. Acoustic Engineering is not required. <br />14. Fire sprinkler system will be specified as a design /build system with <br />deferred approval. <br />15. Record Drawings will be prepared in electronic format based on <br />information provided by the Contractor at the completion of construction. <br />GSA Glass Architects Page 8 of 20 <br />Washington Manor Park Pool Project No. 210-62-002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.