Laserfiche WebLink
basis based on pre-approval by the City. City shall have the primary <br />responsibility for this phase of services and shall be the primary point of contact. <br />Services to include the following: <br />• Respond to contractor requests for information (BFI's) <br />• Review contractor submittals <br />• Perform site inspections as requested by the City of San Leandro <br />• Assistance in evaluating contractor change order requests <br />• Performing regular site visits to observe construction as requested <br />• Attending regular job site meetings <br />• Processing of shop drawings, and submittals <br />• Evaluating cost estimates for change order requests <br />• Issuing clarifications and change orders <br />• Approving monthly progress payment requests <br />• Preparation of a final punch list <br />• Prepare Record Drawings at the completion of construction <br />3.5 City Tasks: <br />The City shall perform the following tasks: <br />• Provide City standard title block <br />• Provide City standard details <br />• Provide topographic survey in AutoCAD 2000 compatible format <br />• Provide Geotechnical Report <br />• Route construction documents sets to appropriate City personnel for review <br />• Review schematic design development set, and provide comments <br />• Review design development set, and provide comments <br />• Review 60% construction document set, and provide comments <br />• Review 95% construction document set, and provide comments <br />• Advertise project and make copies of construction documents for bidding <br />• Route construction documents sets to appropriate City personnel for review <br />3.6 Exclusions: <br />The following items are specifically excluded from the scope of the work for this <br />project: <br />1. Hazardous materials testing and remediation is excluded. <br />2. Waterslide design and engineering will be provided by manufacturer. <br />3. New Pool House building. We assume that this building is 5,000 gross sf, <br />and includes: <br />a. Entry Lobby and Control Desk <br />b. Toilet and Locker Rooms. <br />c. Pool Mechanical Room. <br />CSA Glass Architects Page 7 of 20 <br />Washington Manor Park Pool Project No. 210-62-002 <br />