My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2002 Korve Engineering Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2002
>
Agmt 2002 Korve Engineering Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2009 3:00:42 PM
Creation date
8/21/2009 10:26:53 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
2/19/2002
Retention
PERM
Document Relationships
Reso 2002-023
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Existing drainage facilities located within a 150-foot strip along the realigned roadway <br />centerline will be shown on the drainage plans. <br />• No SWPPP facilities will be included in the drainage system design. <br />Additional Deliverables: <br />• Drainage calculations <br />• Drainage Memorandum (approximately 2 to 3 pages in length including calcs) <br />9. Street Lighting Plans and Details <br />Contractor will prepare the street lighting system plans and detail sheets for the layout of <br />the new systems along the widened Marina Boulevard. The plan sheets will be prepared <br />at a scale of 1-inch equals 20-feet and will show the location of the new street light poles, <br />wiring and conduit system and power sources and cabinet locations. <br />Assumptions: <br />• It is assumed PG&E will furnish service power to the new street light and traffic signal <br />systems. Contractor will coordinate services points with PG&E and show the same on the <br />appropriate system plans. <br />10. Pavement Delineation/Sign/lletail Plans <br />Contractor will prepare pavement delineation and sign plans on the roadway plans base, <br />to show permanent traffic lines, pavement markings and roadway signs for the project. <br />These plans will be prepared at a scale of 1-inch equals 20-feet. Sign details will be from <br />the Caltrans Traffic Manual, standard sign manuals. No special sign details will be <br />provided. <br />Assumptions: <br />• Signing and pavement delineation will be on combined plan sheets <br />• Signs for the project will be from the Caltrans Traffic Manual. No special sign details <br />will be required. <br />11. Traffic Signal Plans <br />Contractor will prepare permanent traffic signal plans for modification of the signal at the <br />intersection of Alvarado Street/Marina Boulevard. The signal plans will be prepared at f- <br />inch equals 20-feet scale based on the roadway plans and intersection details. Each signal <br />will have standard signal face indicators, pedestrian heads and will conform to City <br />standards. Hardwire interconnect will be provided between the signal at Marina/San <br />Leandro Boulevard and pre-emption of the two railroad crossings. <br />A detail sheet for the signal electrical service, pole details and conductor schedule will be <br />prepared to supplement the signal plan sheets to provide the standard information <br />required to construct the signal installation. <br />Assumptions_ <br />• City to provide peak hour traffic counts. <br />• Railroad signal plans for SPRR crossing are not included. <br />• Traffic /railroad signal plans for San Leandro Boulevard are not included. <br />Exhibit A Page 10 of 13 <br />STIP Marina Widening <br />
The URL can be used to link to this page
Your browser does not support the video tag.