My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2002 BKF Engineers
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2002
>
Agmt 2002 BKF Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:20:36 AM
Creation date
8/21/2009 11:20:35 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
3/4/2002
Retention
PERM
Document Relationships
Reso 2002-030
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Prepare basic block plan with all topographic and utilities information for detail <br />design <br />• Street improvement design and detail including new medians <br />• Storm drainage design <br />• Review of applicable -code and regulations <br />• Prepare outline specifications <br />• Coordination with EBMUD and PG&E for service point locations <br />• Prepare preliminary cost estimate and drawings submittal for review <br />• Prepare presentation materials <br />• Attend public meeting <br />• Two design team meetings with City <br />• Two meetings with City and Caltrans <br />• Project administration <br />Deliverables <br />• 8 plan sets on bond showing the location of all major new improvements showing <br />all new curbs, valley gutters, street furniture, trees, planters, crosswalks, bus stops, <br />parking stalls and handicap parking will be shown. The 35% design drawings <br />shall be prepared at appropriate scales. The plan sets shall include but not limited <br />to civil design plans and hadscape plans. Conceptual landscape plans, irrigation <br />plans and electrical plans are to be included for proof of concept and cost <br />estimation purposes. <br />• A Design Development Book will be prepared for the project and suitable <br />materials prepared for a public meeting to inform the residence and business <br />owners of the project <br />• Preliminary Quantity Take-Off and Cast Estimate <br />• Electronic files in AutoCAD format of the final drawings produced. <br />• Presentation materials for public meetings <br />Schedule <br />Preliminary Design 10 weeks from receipt of City's <br />Preliminary Engineering review <br />comments. <br />See attached schedule (Exhibit A-1) for breakdown. <br />Exhibit A Page 3 of 3 <br />6/l2/95 MacArthur Streetscape <br />
The URL can be used to link to this page
Your browser does not support the video tag.