Laserfiche WebLink
2.03 Prepare Cost Estimates <br />Total project estimates will be prepared for each option. The estimates will <br />include not only the estimated cost of construction, but also the costs for <br />administration, testing, design, inspection, and other soft costs. <br />2.04 Committee Meeting #3 <br />The draft alternatives will be presented to the Committee for review and <br />comment. The Committee's direction for any desired revisions will be discussed <br />in the meeting and documented by the consultant. <br />2.05 Revise Alternatives <br />The draft alternatives plans, other drawings, and project cost estimates will be <br />revised as necessary and rendered in color for presentation. <br />2.06 PubUc/User Group Meeting <br />The alternatives will be presented to the user group representatives and other <br />interested members of the public in a public meeting. Comments will be noted, <br />summarized, and distributed. <br />3.0 Draft Report <br />3.01 Prepare Administrative Draft Project Report <br />An administrative draft project report will be prepared. Refer to sample project <br />report outline elsewhere in this proposal for the content to be included. The report <br />will be submitted to City Staff for distribution. <br />3.02 Committee Meeting #4 <br />The administrative draft project report will be reviewed and discussed by the <br />Committee. Comments will be summarized and distributed. <br />3.03 Prepare Project Report <br />The direction received from the Committee and City Staff will be incorporated <br />into the report. The Project Report will be submitted to the City for distribution to <br />project stakeholders and decision-makers. <br />SCIIEDULE. <br />See exhibit A-1 <br />DRAFTING REQUIREMENTS: <br />See exhibit A-2 <br />Exhibit A Page 4 of 4 <br />6/12/95 Burrell Field Reconfiguration Study <br />