BID SUMMARY
<br />~~~ ~~s~ ~~, , ~
<br />1R ~ ,
<br />'~~ti ~~~
<br />PROJECT TITLE: E. 14th Street Medians
<br />PROJECT NO.: 06-750-38-228
<br />Is document Is a summary of bids received for the subject, project ana a
<br />rovided onty as a convenience. Listing of a particular bid Is not a finding that such
<br />bid has been found to be responalve or accepted as complete by the City. An awa
<br />f contract, If any, is subject to approval of the City Council andlor the Clty Manager.
<br />Contractors should refer to the contract documents for bidding Information.
<br />BID OPENING
<br />DATE: Tuesday, August 25, 2009
<br />TIME: 3:00 PM
<br />LOCATION: City Clerk ENGINEER'S ESTIMATE
<br />Date Approved: 7/1312009
<br />Prepared by: NL Joseph J. Albanese, Inc.
<br />986 Walsh Avenue
<br />San Jose, CA 95050
<br />Phone: 408-727-5700
<br />Fax:408-727-0366 Elite Landscaping, Inc.
<br />2972 Larkin Avenue
<br />Clovis, CA 93612
<br />Phone: 559-292-7760
<br />Fax: 559-476-1789 McGuire and Hester
<br />9009 Railroad Avenue
<br />Oakland, CA 94603
<br />Phone: 510-632-7676
<br />Fax:510-562-5209
<br />ITEM
<br />NO.
<br />QUANTITY
<br />ITEM
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />1 1 LS Mobilization $50,000.00 $50,000.00 $20,000.00 $20,000.00 $27,000.QO $27,000.00 $24,235.85 $24,235.85
<br />2 1 LS Temporary Water Pollution $5,000.00 $5,000.00 $6,000.00 $6,000.00 $2,630.00 $2,630.00 $1,500.00 $1,500.00
<br /> Control
<br />3 1 LS Traffic Control System & $30,000.00 $30,000.00 $6,500.00 $6,500.00 $11,000.00 $11,000.00 $12,800.00 $12,800.00
<br /> Flagging
<br />4 1 LS Traffic Handling, Equipment 8~ $25,000.00 $25,000.00 $6,000.00 $6,000.00 $11,000.00 $11,000.00 $3,000.00 $3,000.00
<br /> Devices
<br />5 2 EA Relocate Utility Box $500.00 $1,000.00 $500.00 $1,000.00 $1,500.00 $3,000.00 $325.00 $650.00
<br />6 10 EA Adjust Utility Cover to Grade $250.00 $2,500.00 $500.00 $5,000.00 $475.Q0 $4,750.00 $415.00 $4,150.00
<br />7 21,470 SF Asphalt Concrete 8 Base $1.00 $21,470.00 $3.25 .$69,777.50 $2.10 $45,087.00 $3.05 $65,483.50
<br /> Removal
<br />8 1,410 LF Remove Concrete Curb with or $5.00 $7,050.00 $3.50 $4,935.00 $2.10 $2,961.00 $2.65 $3,736.50
<br /> without Gutter Pan
<br />9 3,760 SF Remove Concxete (includes $2.00 $7,520.00 $1.50 $5,640.00 $2.10 $7,896.00 $3.00 $11,280.00
<br /> Sidewalk and Curb Ramp)
<br />10 1,300 LF Remove White Traffic Striping $2.00 $2,600.00 $0.50 $650.00 $1.10 $1,430.00 $0.40 $520.00
<br /> (Paint & Markers)
<br />11 570 SF Remove Thermoplastic Traffic $3.00 $1,710.00 $1.00 $570.00 $2.10 $1,197.00 $1.00 $570.00
<br /> Stripes & Pavement Markings
<br />12 4 EA Adjust Storm Drain Manhole $1,500.00 $6,000.00 $700.00 $2,800.00 $630.00 $2,520.00 $1,120.00 $4,480.00
<br /> including Concrete Pad
<br />13 2 EA Stonn Drain Manhole Type II $10,000.00 $20,000.00 $3,500.00 $7,000.00 $2,530.00 $5,060.00 $12,200.00 $24,400.00
<br />14 860 CY Roadway Excavation $30.00 $25,800.00 $40.00 $34,400.00 $48.00 $41,280.00 $50.00 $43,000.00
<br />15 060 TON
<br />1 Asphalt Concrete $100.00 $106,000.00 $85.00 $90,100.00 $115.00 $121,900.00 $110.00 $116,600.00
<br />16 ,
<br />110 SF Type A Passage $45.00 $4,950.00 $33.00 $3,630.00 $6.50 $715.00 $32.00 $3,520.00
<br />Bid Summary.xlsx Page t of 6 Printed 8/26/2009 ®9:53 AM
<br />
|