Laserfiche WebLink
BIQ SUMMARY <br /> <br />PROJECT TITLE: ADA Ramp Protect 2009-2010 <br />PROJECT NO.: 09-1653-260 <br />BID NO.: 09-10.007 <br />BID OPENING <br />DATE: Tuesday. August 16, 2009 <br />TIME: 3:00 PM <br />LOCATION: City Clerk <br />ITEM <br />NO. QUANTITY ITEM <br />1 2,200 LF Install curb and gutter per <br />drawing 100 case 3101 <br />2 1,000 SF Install sidewalk per drawing 10t <br />case 3101 <br />3 11,000 SF Install wheelct~air curb ramp pe <br />drawing 106A and B case 3101 <br />4 1,000 SF Install valley gutter per drawing <br />114 case 3101 <br />5 11 Int. Provide Traffic Control plan anc <br />implement traffic control per <br />6 110 F.A Fum~h and Install Sleeve, Sigi <br />Pob, and reinstall existing sign <br />per drawing 136 case 3101 <br />7 440 EA Furnish and Install street name <br />signs per drawing 136 case <br />3101 <br />8 20 EA Furnish and install Bolt down <br />Truncated Dome panel 3'x5' pe <br />note 17 drawing 106D case <br />3101 <br />ENGINEER'S ESTIMATE <br />Date Approved: xxfxxhooor <br />Prepared by: NN JJR Construction, Inc. <br />1120 Ninth Avenue <br />San Mateo, CA 94402 <br />Phone:850-343-s109 <br />Fax:650-343-6207 FBD Vanguard Const., Inc. <br />651 Enterprise Court <br />Livermore, CA 94550 <br />Phone:925-245-1300 <br />Fax:925-245-1007 Spoleto Engineering, Inc. <br />4301 Bettencourt Way <br />Unian City, CA 94587 <br />Phone: 510-487-2424 <br />Fax:510~87-6210 <br /> <br />UNIT COST ITEM COST UNIT COST ITEM COST UNIT COST <br />00 <br />$54 ITEM COST <br />00 <br />800 <br />$118 UNIT COST <br />$48.00 ITEM COST <br />5105,600.00 <br />$48.00 $105,800.00 $48.83 $107,426.00 . . <br />, <br />$14.00 $14,000.00 57.61 $7,610.00 $12.00 $12,000.00 $10.20 $10,200.00 <br />$17.00 $187,000.00 $10.44 $114,840.1)[) $13.70 $150,700.00 $16.95 $186,450.00 <br />$z2.oo 52z,ooo.oo <br />$700.00 $7,700.00 <br />$150.00 s1s,5oo.00 <br />$30.00 $13,200.00 <br />$500.00 <br />$10,000.00 <br />$14.64 $14,640.00 <br />$500.00 $5,5ao.oo <br />$zso.oo $28,soo.oo <br />$190.00 $83,600.00 <br />5375.00 57,500• <br />$, e. oo $, 8,000.00 <br />$535.00 $5,885.00 <br />$165.00 $18,150.00 <br />$110.OOt $48,400.00 <br />$415.00( 58,300.00 <br />$2z.oo $22,000.00 <br />$900.00 $9,900.00 <br />$1so.oo $n,soo.oo <br />$120.00 $52,800.00 <br />$11,800.00 <br />Printed BHBI2009 ~ 4:75 PM <br />ADA Ramps Project.xlsx Page 3 of 4 <br />