<br />PROJECT TITLE: ADA Ramp Protect 2009-2010
<br />PROJECT NO.: 09-1653-260
<br />BID NO.: 09-10.007
<br />BID OPENING
<br />DATE: Tuesday. August 16, 2009
<br />TIME: 3:00 PM
<br />LOCATION: City Clerk
<br />ITEM
<br />NO. QUANTITY ITEM
<br />1 2,200 LF Install curb and gutter per
<br />drawing 100 case 3101
<br />2 1,000 SF Install sidewalk per drawing 10t
<br />case 3101
<br />3 11,000 SF Install wheelct~air curb ramp pe
<br />drawing 106A and B case 3101
<br />4 1,000 SF Install valley gutter per drawing
<br />114 case 3101
<br />5 11 Int. Provide Traffic Control plan anc
<br />implement traffic control per
<br />6 110 F.A Fum~h and Install Sleeve, Sigi
<br />Pob, and reinstall existing sign
<br />per drawing 136 case 3101
<br />7 440 EA Furnish and Install street name
<br />signs per drawing 136 case
<br />3101
<br />8 20 EA Furnish and install Bolt down
<br />Truncated Dome panel 3'x5' pe
<br />note 17 drawing 106D case
<br />3101
<br />ENGINEER'S ESTIMATE
<br />Date Approved: xxfxxhooor
<br />Prepared by: NN JJR Construction, Inc.
<br />1120 Ninth Avenue
<br />San Mateo, CA 94402
<br />Phone:850-343-s109
<br />Fax:650-343-6207 FBD Vanguard Const., Inc.
<br />651 Enterprise Court
<br />Livermore, CA 94550
<br />Phone:925-245-1300
<br />Fax:925-245-1007 Spoleto Engineering, Inc.
<br />4301 Bettencourt Way
<br />Unian City, CA 94587
<br />Phone: 510-487-2424
<br />Fax:510~87-6210
<br />
<br />UNIT COST ITEM COST UNIT COST ITEM COST UNIT COST
<br />00
<br />$54 ITEM COST
<br />00
<br />800
<br />$118 UNIT COST
<br />$48.00 ITEM COST
<br />5105,600.00
<br />$48.00 $105,800.00 $48.83 $107,426.00 . .
<br />,
<br />$14.00 $14,000.00 57.61 $7,610.00 $12.00 $12,000.00 $10.20 $10,200.00
<br />$17.00 $187,000.00 $10.44 $114,840.1)[) $13.70 $150,700.00 $16.95 $186,450.00
<br />$z2.oo 52z,ooo.oo
<br />$700.00 $7,700.00
<br />$150.00 s1s,5oo.00
<br />$30.00 $13,200.00
<br />$500.00
<br />$10,000.00
<br />$14.64 $14,640.00
<br />$500.00 $5,5ao.oo
<br />$zso.oo $28,soo.oo
<br />$190.00 $83,600.00
<br />5375.00 57,500•
<br />$, e. oo $, 8,000.00
<br />$535.00 $5,885.00
<br />$165.00 $18,150.00
<br />$110.OOt $48,400.00
<br />$415.00( 58,300.00
<br />$2z.oo $22,000.00
<br />$900.00 $9,900.00
<br />$1so.oo $n,soo.oo
<br />$120.00 $52,800.00
<br />$11,800.00
<br />Printed BHBI2009 ~ 4:75 PM
<br />ADA Ramps Project.xlsx Page 3 of 4