Laserfiche WebLink
BID SUMMARY <br /> <br />PROJECT TITLE: ADA Ramp Project 2009-2010 <br />PROJECT NO.: 09-18543-280 <br />BID NO.: 09-10.007 <br />BID OPENING <br />ENGINEER'S ESTIMATE <br />JJR Construction, Inc. <br />FBD Vanguard Const., Inc. <br />Sposeto Engineering, Inc. <br />August 18, 2009 <br />DATE: Tuesday Date Approved: xxhor/xxxx 1120 Ninth Avenue 651 Enterprise Court 4301 Bettencourt Way <br />, <br />TIME: 3:00 PM Prepared by: NN San Mateo, CA 94402 Livermore, CA 94550 Union City, CA 94587 <br />LOCATION: City Clark Phone: 650-343-6109 Phon®: 925-245-13~ Phone: 510-487-2424 <br /> Fax:650-343-6207 Fax:925-245-1007 Fax:510-487-6210 <br /> <br />ITEM <br />NO <br />UANTITY <br />ITEM <br />UNIT. COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />. Q 00 <br />000 00 <br />5300 00 <br />000 <br />66 5590.00 311,800.00 <br />9 20 EA Furnish and install Cast in Plaoe 5700.00 514,000.00 5800.00 316, <br />. . , <br />. <br /> Truncated Dome paneel 3'x5' <br /> per note 14 drawing 106C case <br /> 3101 <br />TOTAL BASE BID: :390,000.00 5385,718.00 5388,235.00 :428,150.00 <br />SUBCONTRACTORS: Del Secco Sawcutting, Compaas Striping Graphics Striping Graphics <br /> Engineering <br />SECURITIES: 10% Bid Bond 10% Bid Bond 10% Bid Bond <br />NOTES: <br /> <br />Reviewed by: ~_ Date: g t 9 °j <br />Ni Nom fia Project Manager <br />Date: ~ l9 <br />b <br />y: <br />Reviewed <br />Nick Th ,Senior Engineer <br />N,o Jai N~-- <br />ADA PrpJect~dsx Page 4 of 4 Printed 811812008 ®x:15 PM <br />