Laserfiche WebLink
American Golf Corporation <br />Construction Department <br />Rev. 10!20!97 <br /> <br />SOFT COSTS <br />GOLF ARCHITECT & EXPENSES LUMP 1 5200,000.00 5200,000 <br />CIVIL ENGINEERING LUMP 1 565,000.00 565,000 <br />SOIL CONSULTING LUMP 1 515,000.00 515,000 <br />CLUBHOUSE DESIGN CONSULTANTS LUMP 1 555,000.00 555,000 <br />PERMIT FEES LUMP 1 550,000.00 550,000 <br /> <br /> <br />SUBTOTAL: 5385,000 <br /> <br />SUBTOTAL: S 7, 341,100 <br /> <br />PROJECT CONTINGENCY @ 10°h 5734,110 <br /> <br /> <br />PRELIMINARY PROJECT BUDGET: 58,075,210 <br />This budget is preliminary and is subject to refinement during the <br />design review process and receipt of competitive bids. This budget <br />represents Lessee's good faith estimate of construction costs based <br />on a preliminary design concept for the Renovation. <br />Page 2 <br />