■ Contractor was set back for about a month due to choice in window sub- <br />contractor <br />■ Inside is progressing <br />■ Working on temporary closures <br />Councilmember Reed asked if a walk-through could be scheduled for the Council <br />members to see the Senior Center. Ken said that he has been talking to Kathy <br />Ornelas about scheduling something in early January. <br />o Washington / Beatrice / I-880 <br />■ Working our way to completion <br />■ Traffic has been moved to part of the new ramp <br />■ Left turn from Beatrice onto the freeway is closed at this point allowing <br />the curve to be built <br />• Should be able to open up left turn on-ramp soon <br />■ More asphalt and striping work needs to be done and will close the ramp <br />completely for the last time <br />o 2008-2009 Roadway Rehabilitation Project <br />■ Washington is complete <br />■ All streets are completed with the exception of Dolores <br />■ More asphalt work is needed on Dolores <br />■ Needed to change the design on that street <br />Councilmember Souza asked if notices were sent out to residents regarding <br />construction projects. Ken stated to notices are sent to residences and businesses <br />directly impacted by the construction. <br />o Sidewalk Construction <br />■ Walkway at Wicks Boulevard is nearly complete <br />■ PG&E has some work to do before we can complete <br />o Access Ramps <br />■ Ramps are being put in throughout the city <br />■ 60 of approximately 200 ramps are complete <br />o Temporary Parking Lots <br />■ Hays and Davis <br />• Required sealing of old subterranean structures (wells) <br />• Paving is complete <br />■ Albertson's parcel <br />• Paving as weather permits <br />• Completion scheduled in December 2009 <br />o WPCP <br />■ Waste Activated Sludge Upgrades <br />• Scheduled completion in Spring 2010 <br />■ Co -generation Facility <br />