My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2009-169
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2009
>
Reso 2009-169
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2010 4:40:40 PM
Creation date
1/4/2010 4:30:38 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
12/21/2009
Retention
PERM
Document Relationships
10A Action 2009 1221
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2009\Packet 2009 1221
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />December 21, 2009 Section 7: Implementation <br />methodology employed for the prioritization of measures was developed by KEMA Inc., with <br />each project evaluated with a total of nine possible points based on three elements: <br />GHG reduction (metric tones CO) <br /> – Measures were analyzed for approximate annual <br />? <br />2 <br />26 <br />quantity of greenhouse gas reductions that could be reasonably achieved. <br />GHG Reduction Score <br />> 500 MTCO 3 <br />2 <br />50 - 499 MTCO2 <br />2 <br />< 50 MTCO 1 <br />2 <br />City Costs <br /> – KEMA estimated upfront and first costs to the City to implement the <br />? <br />measure. Most measures were related to City programs for the community, with no <br />savings directly generated for the City. For the few measures that did result in annual <br />savings to the City, payback periods were generally greater than five years and were <br />qualitatively considered in determining the final score. <br />City Costs <br />Score <br />< $50,000 <br />3 <br />$50-999,000 <br />2 <br />> $1 million <br />1 <br />Feasibility <br /> – The analysis also considered whether or not significant barriers may make <br />? <br />implementation of the measure challenging, mainly related to technical and political <br />barriers (e.g. community resistance). In general, a project is considered to have high <br />implementation ability if staff has flexibility to implement with minimal institutional and <br />procedural barriers. Political viability is also included in this score, in consideration of <br />potential stakeholder concerns or opposition. <br />Feasibility <br />Score <br />High <br />3 <br />Medium <br />2 <br />Low <br />1 <br /> <br /> <br /> <br />26 <br /> <br />Emissions Factors utilized: 0.638 lbs CO saved/kWh saved. 0.0053 metric tons CO saved/therm saved. <br />22 <br /> <br />(Source: PG&E public report and The Climate Registry General Reporting Protocol) <br /> <br /> <br />Page 56 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.