Laserfiche WebLink
PART 2. CERTIFICATION OF INSTALLATION ACCORDING TO THE LANDSCAPE <br />DOCUMENTATION PACKAGE <br />"I/we certify that based upon periodic site observations, the work has been substantially completed in accordance <br />with the ordinance and that the landscape planting and irrigation installation conform with the criteria and <br />specifications of the approved Landscape Documentation Package." <br />Signature* Date <br />Name (print) Telephone No_ <br /> Fax No. <br />Title Email Address <br />License No. or Certification No. <br />Company Street Address <br />City State Zip Code <br />*Signer of the landscape design plan, signer of the irrigation plan, or a licensed landscape contractor. <br />PART 3. IRRIGATION SCHEDULING <br />Attach parameters for setting the irrigation schedule on controller per ordinance Section 492.10. <br />PART 4. SCHEDULE OF LANDSCAPE AND IRRIGATION MAINTENANCE <br />Attach schedule of Landscape and Irrigation Maintenance per ordinance Section 492.11. <br />PART 5. LANDSCAPE IRRIGATION AUDIT REPORT <br />Attach Landscape Irrigation Audit Report per ordinance Section 492.12. <br />PART 6. SOIL MANAGEMENT REPORT <br />Attach soil analysis ~n~ge~nt report, if not previously submitted with the Landscape Documentation Package <br />per ordinance Section 492.5. <br />Attach documentation verifying implementation of recommendations from soil analysis report per ordinance <br />Section 492.5. <br />34 <br />