My WebLink
|
Help
|
About
|
Sign Out
Home
3B Public Hearing 2010 0119
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2010
>
Packet 2010 0119
>
3B Public Hearing 2010 0119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2010 9:53:31 AM
Creation date
1/14/2010 9:52:08 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
1/19/2010
Retention
PERM
Document Relationships
_CC Agenda 2010 0119
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2010\Packet 2010 0119
3B Public Hearing 2010 0119 Attachment
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2010\Packet 2010 0119
Reso 2010-003
(Reference)
Path:
\City Clerk\City Council\Resolutions\2010
Reso 2010-004
(Reference)
Path:
\City Clerk\City Council\Resolutions\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Adopted 7/16/2001 -Effective 8/15/2001 City of San Leandro Zoning Code -Article 19 <br />(includes amendments effective through 2007) <br />this article; <br />m. Contain the faliowin~c statement: "i have complied with the <br />criteria of Article 19 of the Zoning Code, including ail design <br />standards of Section 4_-1 gC}8, and applied them for fihe efficient <br />use of water in the landscape design plan"; and <br />n. Bear the signature of a licensed landscape architect, licensed <br />landscape contractor, or any other person authorized to design <br />a landscape. <br />3. Irrigation Design Plan submitted in an applicant's Landscape <br />Documentation Package shah include: <br />a, Location and size of separate water meters for landscape; <br />b. Location, type and size of a!I components of the irrigation <br />system, including controllers, main and lateral lines, valves, <br />sprinkler heads moisture sensing_,devices, rain switches, quick <br />couplers,pressure regulators, and backflow prevention <br />devices; <br />c. Static water pressure at the point of connection to the public <br />water supply; <br />d. Flow rate ~gal{ons per minute), application rate (inches per <br />hour~t and design o~eratinq pressure (pressure per square <br />inch/ for each station: <br />e. Recycled water irrigation systems {if applicable), <br />f. Demonstration of compliance with all design standards <br />specified in the article; <br />The followina statement: "l have complied with the criteria of <br />Article 19 of the Zoning Code, including all design standards <br />and applied them accordingly for the efficient use of water in <br />the irrigation design~alan"~ and <br />h. The signature of a licensed landscape architects certified <br />irrigation designer, licensed landscape contractor, or any other <br />person authorized to design an irrigation system. <br />4. Water Management Plan submitted in an applicant's Landscape <br />Documentation Package shat{ include: <br />a. An introduction and statement of existing site conditions, <br />including annual precipitation rates; <br />b. The anticipated water requirements in inches per year for each <br />hydrozone; <br />c. Seasonal irrigation water schedules or procedures for <br />programming proposed controllers; and <br />d. A maintenance plan far the ongoing operation and maintenance <br />of the irrigation system, <br />AR.19 <br />Page 4 of 1198 <br />
The URL can be used to link to this page
Your browser does not support the video tag.