My WebLink
|
Help
|
About
|
Sign Out
Home
3B Public Hearing 2010 0119
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2010
>
Packet 2010 0119
>
3B Public Hearing 2010 0119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2010 9:53:31 AM
Creation date
1/14/2010 9:52:08 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
1/19/2010
Retention
PERM
Document Relationships
_CC Agenda 2010 0119
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2010\Packet 2010 0119
3B Public Hearing 2010 0119 Attachment
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2010\Packet 2010 0119
Reso 2010-003
(Reference)
Path:
\City Clerk\City Council\Resolutions\2010
Reso 2010-004
(Reference)
Path:
\City Clerk\City Council\Resolutions\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Adopted 7/1612001 -Effective 8115/2001 City of San Leandro Zoning Code -Article 19 <br />(includes amendments effective through 2007) <br />of the Zoning Code, including all design standards and applied them <br />accordingly for the efficient uss of water in the irrigation design plan"; and <br />8. The signature of a licensed landscape architect certified irrigation <br />designer licensed landscape contractor, or any other person authorized to <br />design an irrigation system. <br />~-- <br />O <br />D. Certificate of Completion. Upon approval of the Landscape Documentation <br />Package the applicant shall receive a Certificate of Completion, which shall <br />include the following: <br />1. Proiect Information Sheet. <br />2. Certif<cation that project has been installed in conformance with the <br />approved Landscape Documentation Plan. <br />3. Irrigation scheduling parameters used to set the controfler(s}. <br />4. An audit report (if required <br />5. Landscape and irrigation maintenance schedule. <br />E. Changes to Approved Plans. No significant or substantive changes to approved <br />landscaping or irrigation plans or any plans In the Landscape Documentation <br />Package shall be made without prior written approval by the Zoning <br />Enforcement Official. The Zoning Enforcement Official may refer substantial <br />changes to the Site Development Sub-Commission and may require the <br />approval of the project's decision-making body, such as Board of Zoning <br />Adjustment or Planning Commission, if the requested changes would have a <br />major effect on the character of the project, would effect a landscape <br />requirement that was discussed in the public hearing, or were part of a <br />condition of approval. <br />F. Irrigation Audits. The City of San Leandro shall administer programs that may <br />AR.19 <br />Page 7 of 19~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.