Laserfiche WebLink
Adopted 7/1612001 -Effective 8115/2001 City of San Leandro Zoning Code -Article 19 <br />(includes amendments effective through 2007) <br />of the Zoning Code, including all design standards and applied them <br />accordingly for the efficient uss of water in the irrigation design plan"; and <br />8. The signature of a licensed landscape architect certified irrigation <br />designer licensed landscape contractor, or any other person authorized to <br />design an irrigation system. <br />~-- <br />O <br />D. Certificate of Completion. Upon approval of the Landscape Documentation <br />Package the applicant shall receive a Certificate of Completion, which shall <br />include the following: <br />1. Proiect Information Sheet. <br />2. Certif<cation that project has been installed in conformance with the <br />approved Landscape Documentation Plan. <br />3. Irrigation scheduling parameters used to set the controfler(s}. <br />4. An audit report (if required <br />5. Landscape and irrigation maintenance schedule. <br />E. Changes to Approved Plans. No significant or substantive changes to approved <br />landscaping or irrigation plans or any plans In the Landscape Documentation <br />Package shall be made without prior written approval by the Zoning <br />Enforcement Official. The Zoning Enforcement Official may refer substantial <br />changes to the Site Development Sub-Commission and may require the <br />approval of the project's decision-making body, such as Board of Zoning <br />Adjustment or Planning Commission, if the requested changes would have a <br />major effect on the character of the project, would effect a landscape <br />requirement that was discussed in the public hearing, or were part of a <br />condition of approval. <br />F. Irrigation Audits. The City of San Leandro shall administer programs that may <br />AR.19 <br />Page 7 of 19~ <br />