My WebLink
|
Help
|
About
|
Sign Out
Home
3B Public Hearing 2010 0119
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2010
>
Packet 2010 0119
>
3B Public Hearing 2010 0119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2010 9:53:31 AM
Creation date
1/14/2010 9:52:08 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
1/19/2010
Retention
PERM
Document Relationships
_CC Agenda 2010 0119
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2010\Packet 2010 0119
3B Public Hearing 2010 0119 Attachment
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2010\Packet 2010 0119
Reso 2010-003
(Reference)
Path:
\City Clerk\City Council\Resolutions\2010
Reso 2010-004
(Reference)
Path:
\City Clerk\City Council\Resolutions\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Adopted 7/16/2001 -Effective 8/15/2001 City of San Leandro Zoning Code -Article 19 <br />(includes amendments effective through 2007) <br />B. Ability to Assure Establishment of Landscaping. For projects with significant <br />new landscaping, or where the installation of such landscaping was a project <br />specific condition intended to mitigate a project's impact, the Zoning <br />Enforcement Official may require either or both of the following to assure <br />plant establishment: <br />Posting of a performance bond or certificate of deposit, to cover a two <br />(2) year period. Such bonds shall typically cover the cost of replacing <br />all applicable plant material, but may exclude material and labor costs <br />relating to irrigation; or <br />2. Providing evidence of a minimum two (2) year maintenance contract <br />with a licensed landscape contractor. <br />C. Irrigation Scheduling Far the efficient use of water, all irrigation schedules <br />shall be developed, managed, and evaluated to utilize the minimum <br />amount of water required to maintain plant health. Irrigation schedules <br />shall meet the following criteria: <br />1. Irrigation scheduling shall be regulated by automatic irrigation <br />controllers. <br />2. Overhead irrigation shall be scheduled between 8:00 p.m. and 10:00 <br />a.m. unless weather conditions prevent it. If allowat~le hours of <br />irrigation differ from the local water purveyor the stricter of the two <br />shall apply. Operation of the irrigation system outside the normal <br />watering window is allowed for auditing and system maintenance. <br />3. For implementation of the irrigation schedule particular attention must <br />be paid to irrigation run times, emission device, flow rate and current <br />reference evapotranspiration, so that applied water meets the <br />Estimated Total Water Use. Total annual applied water shall be less <br />than or equal to Maximum Applied lfVater Allowance fMAWA}, Actual <br />irrigation schedules shall be regulated by automatic irrigation <br />controllers using current reference ev~otranspiration data (e.q. <br />CIMIS) ar soil moisture sensor data. <br />4. Parameters used to set the automatic controller shall be developed <br />and submitted far each of the following: <br />a. The /ant establishment eriod~ <br />b. The established landscape; and <br />c. Temporarily irrigated areas. <br />5, Each irrigation schedule shalt consider far each station all of the <br />following that apply: <br />a. irrigation interval (dais between irrigation) <br />b. irrigation run times (hours or minutes per irrigation event to <br />avoid runoff); <br />c. number of cycle starts required for each irrigation event to avoid <br />runoff; <br />AR.19 <br />Page 17 of 191 <br />
The URL can be used to link to this page
Your browser does not support the video tag.