Laserfiche WebLink
• Muir Synthetic Field <br />• Chabot Park Playground <br />• San Leandro Ball Park Locker/Restroom <br />• Thrasher Park Drainage <br />Reasoning: San Leandro needs a competitive pool to finish the project. Make sure the money is spread <br />around the community; Safety a big concern -most bang for the buck; Toyon Park has no play <br />equipment; there is no secure, enclosed area for dogs; Muir Soccer Field and Thrasher field, poor <br />drainage; Chabot Park very old equipment; San Leandro Ball Park used for many games and <br />tournaments and is very old. <br />PRIORITY PROJECTS UST <br />On the list below, the number reflects the number of times the project was included on one of the <br />groups' lists. Projects that were listed the same number of times are listed alphabetically. <br />7 Toyon Park Play Equipment $435 $ <br />5 Marina Park Irrigation Improvements $622 $ <br />5 Par Course Improvements $923 $ <br />4 Marina Dog Park $491/312 $$$ <br />4 SL Ball Park Locker/Restroom Refurbishment $130 $ <br />4 Stenzel Park Drainage $179 $ <br />3 Marina Park Group Picnic Areas $988 $ <br />3 Pacific 1 and 2 Bleachers $113 $ <br />3 Resurface Skate Park with Concrete $ 56 $ <br />2 All Parks Rehab of Asphalt Walkways $250 $ <br />2 Chabot Park Playground and <br />Amphitheater Replacement $1,022 $$ <br />2 Cleveland Park Play Structure $250 $ <br />2 SLFAC Competition Pool $3,675 $$$$ <br />2 5iempre Verde Park Playground Equipment $745 $ <br />2 Stenzel Park Bleacher Renovation $152 $ <br />2 Stenzel Park Parking Lot Repair $ 94 $ <br />2 Thrasher Park Field Drainage $ 78 $ <br />