Laserfiche WebLink
"Triangle Project" Excerpts <br />FY2411 Atwroyriations Proiect Summary <br />General Project Information: <br />1. <br />2. How much fundinv are vnn rennesrin~> <br />$2,000,000 ~..,~~.~..~.~... ....~~~~~~ <br />3. Please write a brief summary of the project (250 word limit): <br />____ __ _ _____---_~. _~.~.~.~.....~, ,..v~....., <br />'; The project is the southern anchor of the City's East 14th Street South Area project to <br />f <br />Leandro. <br />The improvements include adding turning lanes, construction of bus stop pockets, <br />reconfiguring existing lanes and pedestrian access and entryway streetscape features. <br />The project will construct a second left turn lane on southbound East 14th Street at <br />~ 150th Ave, construct a bus stop pocket and a right turn lane on the southbound East 14tH <br />~ Street at 150th Avenue, add a second northbound left turn on Hesperian Boulevard at <br />f East 14th Street, convert the through/left lane on southbound Bancroft Avenue to a <br />~ dedicated left turn lane at East 14th Street, and acquire the triangle-shaped parcel in the <br />intersection and remove the existing building and install streetscape improvements. <br />~vaine ~i pr~ieci oeulg sunmiccea <br />East 14th Street / Mesperian Boulevard / 150th Avenue Improvements <br />1 <br />