Laserfiche WebLink
o Bay Trail Slough Bridge <br />■ Construction substantially complete <br />■ Paving waiting for favorable weather conditions <br />■ Scheduled to be complete prior to Bike to Work Day in May <br />■ There have been requests for an earlier opening day <br />o Projects Out to Bid <br />■ Wicks and Blue Dolphin Sanitary Sewer Pump Station Replacement <br />• Estimated cost $782,000 (WPCP funds) <br />• Bid opening scheduled for March 10, 2010 <br />■ Springlake Drive Roadway Reconstruction <br />• Estimated cost $360,000 (ARRA funds) <br />• Bid opening scheduled for March 3, 2010 <br />o Upcoming Construction <br />■ 2550 Davis Street Remediation <br />• Environmental cleanup of site <br />• Funded through acquisition — less paid to property owner <br />East 14th Street -Street Light Replacement <br />• 150th Avenue to southern City limit <br />• Part of Phase 1 of undergrounding <br />• Funded through undergrounding fees <br />East 14th Street Restriping <br />• Broadmoor Boulevard to Hays Street <br />• DFSI funded <br />o Callan Garage <br />■ Design in final review <br />■ Awaiting grant announcement 2/17 <br />■ Grant would provide all funding and require some redesign for electric <br />vehicle charging and battery swap stations <br />■ Without grant, project is RDA funded and would bid in Spring 2010 <br />■ Impact of HUD 108 Loan <br />o Preda Street Sanitary Sewer Bridge <br />■ Two sanitary sewer lines over San Leandro Creek <br />■ Bridge structures were damaged by fallen trees <br />■ Sewer lines are not seismically stable <br />■ Plans at 90% design <br />■ Construction planned for Summer 2011 due to habitat restrictions <br />Councilmember Souza asked how the Preda Street Sanitary Sewer Bridge project is being <br />funded. Ken stated that it is being funded through Water Pollution Control Plant Enterprise <br />funds. <br />o Upcoming Street Rehabilitation <br />0 Bancroft Avenue <br />