My WebLink
|
Help
|
About
|
Sign Out
Home
FacilitiesTransportation Highlights 2010 0209 v2
CityHall
>
City Clerk
>
City Council
>
Committees
>
Facilities & Transportation Committee
>
FacilitiesTransportation Highlights 2010 0209 v2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 10:00:01 AM
Creation date
3/9/2010 2:23:54 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Committee Highlights
Document Date (6)
2/9/2010
Retention
PERM
Document Relationships
_CC Agenda 2010 0301
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2010\Packet 2010 0301
FacilitiesTransportation Highlights 2010 0209 v1
(Superseded)
Path:
\City Clerk\City Council\Committees\Facilities & Transportation Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o Bay Trail Slough Bridge <br />■ Construction substantially complete <br />■ Paving waiting for favorable weather conditions <br />■ Scheduled to be complete prior to Bike to Work Day in May <br />■ There have been requests for an earlier opening day <br />o Projects Out to Bid <br />■ Wicks and Blue Dolphin Sanitary Sewer Pump Station Replacement <br />• Estimated cost $782,000 (WPCP funds) <br />• Bid opening scheduled for March 10, 2010 <br />■ Springlake Drive Roadway Reconstruction <br />• Estimated cost $360,000 (ARRA funds) <br />• Bid opening scheduled for March 3, 2010 <br />o Upcoming Construction <br />■ 2550 Davis Street Remediation <br />• Environmental cleanup of site <br />• Funded through acquisition — less paid to property owner <br />East 14th Street -Street Light Replacement <br />• 150th Avenue to southern City limit <br />• Part of Phase 1 of undergrounding <br />• Funded through undergrounding fees <br />East 14th Street Restriping <br />• Broadmoor Boulevard to Hays Street <br />• DFSI funded <br />o Callan Garage <br />■ Design in final review <br />■ Awaiting grant announcement 2/17 <br />■ Grant would provide all funding and require some redesign for electric <br />vehicle charging and battery swap stations <br />■ Without grant, project is RDA funded and would bid in Spring 2010 <br />■ Impact of HUD 108 Loan <br />o Preda Street Sanitary Sewer Bridge <br />■ Two sanitary sewer lines over San Leandro Creek <br />■ Bridge structures were damaged by fallen trees <br />■ Sewer lines are not seismically stable <br />■ Plans at 90% design <br />■ Construction planned for Summer 2011 due to habitat restrictions <br />Councilmember Souza asked how the Preda Street Sanitary Sewer Bridge project is being <br />funded. Ken stated that it is being funded through Water Pollution Control Plant Enterprise <br />funds. <br />o Upcoming Street Rehabilitation <br />0 Bancroft Avenue <br />
The URL can be used to link to this page
Your browser does not support the video tag.