Laserfiche WebLink
3/9/2010 <br />Background <br />0 2003 Capacity Study -Electrical System <br />Evaluation Report <br />0 2005 Facility Assessment and Ranking of <br />Projects <br />0 2006 Design started on electrical system, <br />WAS, Flow EQ -work halted due to <br />inefficiency of working one project at a time <br />0 2008 Award contract to Carollo for Plant <br />Rehabilitation design <br />0 2009 Pre-Design completed <br />12 Major Project Elements <br />~. Primary Effluent Flow Equalization (M) <br />2. Replace Headworks (M) <br />3. Replace Influent Pump Station (M) <br />a. Secondary Treatment Improvements (M) <br />s. Electrical System Improvements (M) <br />s. Add Primary Clarifier (M) <br />~. Primary Clarifier Improvements (R) <br />s. Secondary Clarifier Improvements (R) <br />s. Digester Improvements (R) <br />~o. Site and Yard Improvements (R) <br />~~. Administration Control Building Retrofit a <br />12. New Grit Removal Facility (B) <br />4 <br />