Laserfiche WebLink
3/9/2010 <br />Flow Equalization Backgroun <br />o Discharge permit will not <br />allow blending primary <br />effluent with secondary <br />effluent after Oct. 2011 <br />o Staff currently uses <br />abandoned process <br />tanks to store wet <br />weather flows <br />0 3.8 MG required but only <br />1.1 MG available <br />Flow Equalization Improvements <br />o Construct new 3.0 Potential New Equalization <br />MG lined storage storage Basin <br />lagoon to store wet 61,~,~ <br />weather flows <br />o Reuse existing <br />tanks to reduce <br />costs <br />o Automate process to <br />reduce staff <br />attention and lower <br />O&M costs <br />5 <br />